Forum quick links
Airport as transit station.
NC-v4 LTc5:Access to quality transitposted by Jeff DeHaven on
Our project is within 1/2-mile walking distance to an existing airport terminal building.
Fan control
CS-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
I'm working on a project where the building owner is going to provide several Fan&Coil units, the fan control of these units has 4 different presets of velocity being: super high, high, medium,
Simple Box energy model requirements
CI-v4 IPc1:Integrative processposted by Deborah Stadler on
What exactly is required to be submitted for documentation for the simple box model? We see the worksheet and narrative listed as required documentation for this credit. There is so muc
More Stringent Energy Codes
NC-2009 EAp2:Minimum Energy Performanceposted by Jason Cocek on
Does anyone know if there was a point where the IECC became more stringent than ASHRAE 90.1-2007 that is generally accepted by reviewers or is it always necessary to upload justification that the c
Building with confidential spaces
EBOM-v4 EAp2:Minimum energy performanceposted by Ameet AA on
Hello,
IEQc4.2 VOC Limits
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Saud Abdul Rasheed on
Hello all, 1) For Table 1 Satndard VOC limits, there are different values falling under Ceiling limit, Current limit and Effective date.
Energy Utilization Index incomplete.
EBOM-v4 EAp1:Energy efficient best management practicesposted by Ana Paula Quiros on
One of the comments we've got states the following:
PIf3 Total number of residents
NC-2009 PIf3:Occupant and Usage Dataposted by Oscar Estevez on
I have a Hospital project with one question on Table Plf3-3 Total number of residents:
Reviewer Writes: Daily average FTE values should be higher than Peak FTE values
NC-2009 PIf3:Occupant and Usage Dataposted by Diego Prada on
Greetings everyone,
use of waste heat from iIndustrial process for the office heating
NC-v4 EAc5:Renewable energy productionposted by Qian Tang on
Dear all,
we are planning a new office building direct near the production hall of the same owner. Only office building will be certified.