Written commitment for Ergonomics program clarification
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Kristen Magnuson on
I have a question about the following requirement for this pilot credit:
LEED Online Form Requirements
CI-v4 MRp2:Construction and demolition waste management planningposted by Marcia Weekes on
I am a bit confused by the information that is being requested at the top of on the LEED Online form associated with this prerequisite.
Garage Demand Control Ventilation
NC-v4 EAp2:Minimum energy performanceposted by Charalampos Giannikopoulos on
If attempting to make use of LI 10371 for garage demand control ventilation how should the proposed model be differentiated from baseline to take advantage of CO sensors?
Cooling Tower drift eliminator - standards for processes
NC-v4 WEp2:Indoor water use reductionposted by Dionisio Franca on
We checked the drift eliminator specs with the manufacturer selected for our project and they told us that that their draft eliminators reduce drift to 0.05% only.
100% of Waste to RCI Hauler
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Kristina Bach on
We ran into a couple of questions with this credit for a project that used two haulers - one was RCI-certified and one was not.
Using "Informing Design Using Triple Bottom Line Analysis" Pilot Credit for a HC 2009 project
Pilot-Credits SSpc113:Informing Design Using Triple Bottom Line Analysisposted by Megan Leslie on
I just went through the process of using Autocase to document this credit for a Hospital project using the LEED 2009 for Healthcare: New Construction rating system. There were a few inst
IEQ 0 VOC General Emissions Test Needed?
NC-v4 EQc2:Low emitting materialsposted by Jenelle Shapiro on
If any wet applied product is shown to have 0 VOCs, does it still need a general emissions evaluation?
Safe Paths of Travel in rural areas
Schools-NC-v4 LTc4:Surrounding density and diverse usesposted by Lou Niles II on
Hello has anyone seen a path or strategy for achieving credits that require safe paths of travel in rural areas or unincorporated areas?
approaching the requirements of WEpc94
Pilot-Credits WEpc94:No Cooling Towerposted by Anke Koch on
Our project is a ca. 300,000 sqft mix-usage building with office spaces in the upper floors and restaurant and gym spaces on the ground floor.