Forum quick links
Vocational Shops
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Jessica Diaz on
Does anyone know if a workshop area is considered a "core learning space" or an "ancilliary learning space"?
Documenting WEpc94
Pilot-Credits WEpc94:No Cooling Towerposted by Dan Ackerstein on
The building we are seeking to certify is a commercial office building in Hyderabad, India, which is a hub for India's growing tech industry.
Storage and collection of recyclables- Size
NC-v4 MRp1:Storage and collection of recyclablesposted by Cora Kenrick on
Hello,
Can someone advise me on where i would find on how large (m2) my storage and collection area/room needs to be.
Thank you.
Guidelines/Sample of a good ESC plan proposal
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Ann E on
Tenant Lease Agreement - Required for Credit
CS-2009 EAp3:Fundamental Refrigerant Managementposted by Lee Han on
I'm currently working on this credit, tenant work is definitely anticipated for future work. The building owner usually don't deal with lease agreements.
Airport terminal - 3 floors, less than 126,000 SF
CI-v4 EAp2:Minimum energy performanceposted by Stacey Olson on
Our system was modeled with a baseline of System 5 - Package VAV w/ Reheat, and is one system per floor.
LEED v4 Indoor Water use reduction or outdoor water use reduction
NC-v4 WEp2:Indoor water use reductionposted by Lou Niles II on
Hello I am trying to get some guidance with regard to LEED v4 and outdoor sinks.
Sinks used in outdoor spaces for office buildings or campus , maybe for the BBQ gathering area.
Lead CxA Representative appointment; Delay causing concerns... Urgent solution required!
NC-v4 EAc1:Enhanced commissioningposted by Olawale Taiwo on
Background Consideration:
Does implementing MBCx remove the requirement for discrete OCx functional performance testing?
NC-v4 EAc1:Enhanced commissioningposted by Ilkka Mäkelä on
Hello,
If MBCx were to be implemented in a project, is the discrete functional performance testing and reporting part of OCx not required?
MBCx Plan as part of the Ongoing Cx Plan
NC-v4 EAc1:Enhanced commissioningposted by Francesco Passerini on
Can the MBCx Plan be presented as a part of the Ongoing Cx Plan?