Example occupant comfort surveys other than CBEs?
EBOM-v4 EQc10:Occupant comfort surveyposted by Lauren Anderson on
Hi there,
Submittal schedule
CI-2009 PIf4:Schedule and Overview Documentsposted by Hana Altabbaa on
This is a general question about submittal deadlines, In case we are doing split submittal, is there any rule that we have to submit the final design submittal before substantial completion date of
Private Entity Recieving Asphault Waste
NC-2009 MRc2:Construction Waste Managementposted by Brian Harris on
Hi,
Can waterscapes such as fountains, cascades and similar features contribute to this credit?
NC-v4 SSc5:Heat island reductionposted by Olga Yuil on
Can waterscapes such as fountains, cascades and similar features contribute to this credit?
LEED interpretation ID # 10235
NC-v4 SSc5:Heat island reductionposted by Juan Carlos Contreras on
Hi, Is the “LEED interpretation ID # 10235” available for a LEED v4 project? LEED interpretation ID # 10235: Roof area that consists of functional, usable spaces- such as helipads, recreation co
Specs for approved roll out mat that is less than 10'-0" in length
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Victor Caban-Diaz on
Does anybody have specs for an approved roll out mat that is less than 10'-0" in length that can be used for this credit?
expected volume
NC-2009 MRp1:Storage and Collection of Recyclablesposted by Richardson Jean-Baptiste on
Hello all How would one know the expected volume for a building, as well as the frequency of collection for a new project? Can one reference a similar building (similar in s.f.
Flexible Power Distribution
CI-v4 MRc2:Interiors life-cycle impact reductionposted by roma goyal on
Hello,
I would like to know e=waht does 'flexible power distribution i.e. plug and play system' mean?
what are the equipments to be considered for this system?
Lighting Power Density for berth and roadway areas - space by space method
NC-v4 EAp2:Minimum energy performanceposted by Dionisio Franca on
I'm working with a large scale multi-floor distribution center and trying to determine the correct LPD - lighting power densities of the berths and vehicle paths.