Construction Phases

Hospitality-NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Larissa Murakami  on 

We have a project to be registered in LEED NC for hotels. The project consists of several towers and some units of chalets.

1
Fri Jun 29, 2018, 1:24 am

Can anyone share approach taken to comply with this or related Certified Multi-attribute Products and Materials?

Pilot-Credits MRpc103:Integrative Analysis of Building Materials
posted by  Panu Pasanen  on 

Hi, this looks pretty demanding spec, as the related "Certified Multi-attribute Products and Materials".

2
Wed Jun 27, 2018, 3:07 pm

Pilot credit - Building Material Human Hazard & Exposure Assessment

Retail-CI-v4 INc1:Innovation
posted by  Stacey Olson  on 

It appears that using 5 products which have Declare Labels and/or which are listed on the Pharos site would satisfy the requirements of this credit. Can you please confirm.

Thanks,

0

CALGreen certification as alternate to Watersense?

CI-v4 WEp1:Indoor water use reduction
posted by  Paladino "Team"  on 

Would GBCI accept a plumbing fixture that is CALGreen certified as an alternative compliance path to the Watersense requirement?

3
Sustainability Associate
Urban Fabrick, Inc.
LEEDuser Basic Member
7 thumbs up
Tue Jun 26, 2018, 7:17 pm

Establishment period for 50% landscape water use reduction

NC-2009 WEc1:Water Efficient Landscaping
posted by  Dimuth Kurukulaarachchi  on 

All mention of establishment periods refer to the no potable water/irrigation case (WEc1 Option 2), but what about for Option 1, 50% non-potable water use reduction?

0

Temperatures for Tab.6.8.1I

CS-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

According to Tab.6.8.1I for test procedure for VRF systems we have to consider AHRI 1230. I’m considering AHRI 1230 version “Approved by ANSI on 2 August 2010”.

3
Tue Jun 26, 2018, 1:59 pm

Accessible Floor and Ceiling system

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  roma goyal  on 

Hello,

I would like to know what does "accesible floor and ceiling system" mean?

Does it mean suspended ceiling system and raised floor system for 50% of the total floor area.

0

MLO Non-Residential Lighting using the Performance Method

NC-v4 SSc6:Light pollution reduction
posted by  Candace Cohen  on 

The MLO says that in order to establish the Total Initial Site Lumens one must use Table D, adding together the Allowed Lumens Per Square Foot and the Allowed Base Lumens Per Site.

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Tue Jun 26, 2018, 9:23 am

little help about exemple of projects certified as LEED O + M: Existing Buildings

Credit Forums
posted by  ANDREZA PASSOS  on 

Hello, someone could help me, I'm writing my dissertation for university and I'm looking for some projects certified as LEED O + M: Existing Buildings, someone knows where I can find projects with

0