Is Energy Recovery Mandatory?

CS-v4 EAp2:Minimum energy performance
posted by  Cathal Heneghan  on 

Hi all

Can you confirm if Energy Recovery per 6.5.6.1 is a mandatory requirement for the proposed building?

Thanks

 

1
Fri Jun 22, 2018, 1:41 pm
4
Sustainable Design Lead
CannonDesign
LEEDuser Expert
379 thumbs up
Thu Jun 21, 2018, 4:26 pm
3
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Jun 21, 2018, 4:09 pm

IAQ Testing

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Kelly Searle  on 

I am working on a major renovation project - 11 story office building.

4
Thu Jun 21, 2018, 3:56 pm

Metered Faucets w/less than 12 Sec Duration

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Michelle Rosenberger  on 

I have received my second metered lav faucet submittal with less than 12 sec from factory duration.

9
Thu Jun 21, 2018, 3:17 pm

Does economic analysis to forgo DES phaseout apply in V4?

NC-v4 EAp4:Fundamental refrigerant management
posted by  Jeff Ross-Bain, PE, LEED Fellow, WELL AP  on 

In the 2009 Reference Guide, an alternative path that allows foregoing DES plant replacement through an economic analysis that shows DES replacement is economically unfeasible is clearly stated.

6
Wed Jun 20, 2018, 10:25 pm
9
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jun 20, 2018, 8:16 pm

Core & Shell with HVAC as future / CI scope

NC-v4 EAp1:Fundamental commissioning and verification
posted by  Stacey Olson  on 

If a project is a cold, dark shell without hot water, can commissioning be deferred as n/a or does a cxa still need to be engaged to preform OPR and BOD review?