Air Testing before Occupancy for phased move-in
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Karl Heitman on
How does LEED interpret occupancy date?
Is Energy Recovery Mandatory?
CS-v4 EAp2:Minimum energy performanceposted by Cathal Heneghan on
Hi all
Can you confirm if Energy Recovery per 6.5.6.1 is a mandatory requirement for the proposed building?
Thanks
waste due to flooding
CS-2009 MRc2:Construction Waste Managementposted by Nicole Isk on
Dear LEEDers,
Baseline case system selection- Exception
NC-v4 EAp2:Minimum energy performanceposted by Manikandan S on
Hi All,
IAQ Testing
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Kelly Searle on
I am working on a major renovation project - 11 story office building.
Metered Faucets w/less than 12 Sec Duration
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Michelle Rosenberger on
I have received my second metered lav faucet submittal with less than 12 sec from factory duration.
Does economic analysis to forgo DES phaseout apply in V4?
NC-v4 EAp4:Fundamental refrigerant managementposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
In the 2009 Reference Guide, an alternative path that allows foregoing DES plant replacement through an economic analysis that shows DES replacement is economically unfeasible is clearly stated.
Pumps: Balancing Report HPs vs Design
NC-2009 EAp2:Minimum Energy Performanceposted by Gaston Viau on
Hi there
Core & Shell with HVAC as future / CI scope
NC-v4 EAp1:Fundamental commissioning and verificationposted by Stacey Olson on
If a project is a cold, dark shell without hot water, can commissioning be deferred as n/a or does a cxa still need to be engaged to preform OPR and BOD review?