Forum quick links
Achieving credit in a Rest Area
NC-v4 LTc7:Reduced parking footprintposted by Julie Hardy on
The provincial government is designing a Rest Area for an important Highway, the project will also is to be operated and owned by the provincial government.
Receipt Proof Requirements
NC-2009 MRc3:Materials Reuseposted by jupiter luner on
I wanted to clarify something that I recently heard from a contractor on a LEED project.
Is Athena Impact Estimator databses is recommende for South Asia
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Malan Jayawickrama on
I want to know whether LEED is accepting the results of whole building LCA conducted by using Athena Impact Estimator for a Building in Sri Lanka.(Since it is only for North America) Or else what
absence of material in a category
NC-v4 EQc2:Low emitting materialsposted by Jens Apel on
What if there is no material in a certain category, e.g. composite wood?
Preferred Parking Requirement
CI-v4 LTc5:Reduced parking footprintposted by Patty Lloyd on
For our project, 60% below baseline for our building type would be 30.33 parking spots.
APPA custodial audit
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Minh Le on
How to calculate the average score for space type ?
Data Center Minimum Requirement of 2%
NC-v4 EAp2:Minimum energy performanceposted by Amine Zeidane on
Hello,
Ventilation calculation square footage boundary
NC-2009 IEQp1:Minimum IAQ Performanceposted by Melissa Mikulka on
We have a project that contains a recycle bin storage area within a corridor. Do the exhaust calculations have to include the entire corridor space or can we designate an area around the
Recertification - Survey - How Often?
EBOM-v4 LTc1:Alternative transportationposted by Michelle Bracewell-Musson on
Hello,
Pre Fab Building Compliance
NC-v4 EQc2:Low emitting materialsposted by Kristen Magnuson on
Is it still possible to get 3 points for 5 compliant credit categories, if the building is entirely constructed off-site and then brought to the site and assembled?