Forum quick links
4VOC certification
CI-v4 EQc2:Low emitting materialsposted by DAVE LI on
Japan has a Third Party certification called 4 VOC.
This certification carries out relevant tests on Toluene, xylene, ethylbenzene, and styrene, and sets benchmark values.
CFR and O&M plan information
CI-v4 EAp1:Fundamental commissioning and verificationposted by Michael on
Hi LEEDusers,
Green Cleaning ID credit for residential building?
NC-2009 IDc1:Innovation in Designposted by Erica Downs on
Has anyone successfully earned an ID point for Green Cleaning in a residential condo building? The common areas of the building would be under a green cleaning contract that meets the credit
LEED Project boundary
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Neetika Parmar on
Our Project is an Office cum warehouse.
Take back program language for contract
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Brightworks Sustainability on
Does anyone have a sample contract with a manufacturer for a take back program? My project teams are asking about this and we are not sure who the responsibility falls on - owner? GC?
Using carbon credits for scope 2
Retail-CI-v4 EAc6:Green power and carbon offsetsposted by Raissa Petri on
Hello,
How should I convert energy consumption into carbon credits in Brazil? I used GHG Protocol tool, which is the most recognized one in the country. Is that acceptable?
Dedicated Central OA Unit
CI-v4 EQp1:Minimum indoor air quality performanceposted by Jalal Avades on
Our project is a Commercial Interior in two floors of an existing tower. The floors are served by 4-pipe fan coils.
Exemplary Performance
CS-v4 SSc5:Heat island reductionposted by Emmanuel Pauwels on
The Reference Guide states as requirement for Exemplary Performance: Achieve both Options 1 and 2. Locate 100% of parking under cover.
Light Reflectance values
CI-v4 EQc6:Interior lightingposted by Karen Elliott on
How do you calculate the light refectance value of a glass partition?
Assigning two ac systems to a single zone
NC-2009 EAp2:Minimum Energy Performanceposted by Madushan Samarakoon on
I am working with shopping mall project. each shop has equipped with FCU units for air conditioning while separate treated fresh air AHU (PAHU) is supplying fresh air to each shop.