ERV and multiple fan coil units

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Courtney Royal  on 

Hello, I've only completed the ventilation spreadsheet a few times and have a few questions. Thanks!

5
President
AGR Consulting, LLC
LEEDuser Basic Member
14 thumbs up
Mon Jun 11, 2018, 10:38 pm

LEED for Schools 25% core space

Schools-2009 MPR2:Must be a complete, permanent building or space
posted by  Bill Swanson  on 

In the Rating Selection Guide there is the general rule that 60% of a space for a specific building type means that this project must be registered for that specific LEED category.

0

High-powered experimental equipment

NC-v4 EAp2:Minimum energy performance
posted by  DAVE LI  on 

We have a laboratory with high-powered experimental equipment. High-power experimental equipment consumes a very high percentage of electricity. 

1
Mon Jun 11, 2018, 2:03 pm

Previously developed and graded area by municipality - How long before construction?

NC-2009 SSc1:Site Selection
posted by  Ilan Yahav  on 

I am working on a Non-US project that is located in a new neighborhood that had been graded and developed by the local Municipality (roads and sidewalks) in 2006.

0

BUG Rating System and general equivalent standards for Ireland

CS-v4 SSc6:Light pollution reduction
posted by  Matt Vesey  on 

I'm working on an office/industrial mixed use development.

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Jun 11, 2018, 8:47 am
2
Construction Administrator/ LEED AP
Bywater Woodworks, Inc.
LEEDuser Basic Member
42 thumbs up
Fri Jun 8, 2018, 8:45 pm

Option 2 HVAC Zoning & Controls

CI-v4 EAc2:Optimize energy performance
posted by  Aaron Wintersmith  on 

The credit language for this Option says "provide a separate control zone for each solar exposure and interior space."

3
Default Avatar
Senior Energy Analyst
Capital Engineering Consultants
LEEDuser Basic Member
0 thumbs up
Fri Jun 8, 2018, 2:51 pm

Self-declared reports

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Charalampos Giannikopoulos  on 

Is there a template of self-declared report for compliance with Option 1? Has anyone ever specified a way of complying with requirements of Option 1? Thank you.

1
Mon Oct 15, 2018, 6:05 pm

Enhanced Commissioning LEED V4

CI-v4 EAc1:Enhanced commissioning
posted by  Michael Feyler  on 

Per the USGBC LEED V4 BD+C: New Construction Enhanced Commissioning website "The CxA may be a qualified employee of the owner, an independent consultant, or a disinterested subcontractor of the des

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Jun 7, 2018, 7:54 pm