Hello, I've only completed the ventilation spreadsheet a few times and have a few questions. Thanks!
LEED for Schools 25% core space
Schools-2009 MPR2:Must be a complete, permanent building or spaceposted by Bill Swanson on
In the Rating Selection Guide there is the general rule that 60% of a space for a specific building type means that this project must be registered for that specific LEED category.
High-powered experimental equipment
NC-v4 EAp2:Minimum energy performanceposted by DAVE LI on
We have a laboratory with high-powered experimental equipment. High-power experimental equipment consumes a very high percentage of electricity.
Previously developed and graded area by municipality - How long before construction?
NC-2009 SSc1:Site Selectionposted by Ilan Yahav on
I am working on a Non-US project that is located in a new neighborhood that had been graded and developed by the local Municipality (roads and sidewalks) in 2006.
BUG Rating System and general equivalent standards for Ireland
CS-v4 SSc6:Light pollution reductionposted by Matt Vesey on
I'm working on an office/industrial mixed use development.
CARB ATCM and TSCA Title VI Test Results used for IEQc4.4?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Melanie Blacklock on
My subcontractor has submitted a Test Report showing the MDF has passed the following:
Energy savings from Battery Storage
NC-2009 EAp2:Minimum Energy Performanceposted by Vinay Shekar on
Hello,
Option 2 HVAC Zoning & Controls
CI-v4 EAc2:Optimize energy performanceposted by Aaron Wintersmith on
The credit language for this Option says "provide a separate control zone for each solar exposure and interior space."
Self-declared reports
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Charalampos Giannikopoulos on
Is there a template of self-declared report for compliance with Option 1? Has anyone ever specified a way of complying with requirements of Option 1? Thank you.
Enhanced Commissioning LEED V4
CI-v4 EAc1:Enhanced commissioningposted by Michael Feyler on
Per the USGBC LEED V4 BD+C: New Construction Enhanced Commissioning website "The CxA may be a qualified employee of the owner, an independent consultant, or a disinterested subcontractor of the des