Forum quick links
Hotel mix use
NC-v4 EAp2:Minimum energy performanceposted by jefferson thomas on
We have a hotel with 4,000 SF of retail at the lower level of a new construction hotel project? How do we sepperate the two projects if they have a central energy plan for chilled water?
Future spaces for expansion vs date of certification
NC-v4 EAp1:Fundamental commissioning and verificationposted by Víctor Ramírez Orozco on
we are designing a school project with 14 classrooms and 5 more classrooms planned for future expansión of the school. Those 5 classrooms will not have anything but the walls, windows, and doors.
Exclusions from Regularly Occupied Spaces for Lab Spaces
CS-v4 EQc4:Daylightposted by Jordan Daniels on
I was wondering if someone can help here. Working on a v4 C&S 5 story building. Some of the tenant space on each floor is laboratory space (40% approximately of each floor).
waste rooms
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
The project is located in Europe and standard EN 15251 is considered for the achievement of this prerequisite.
SSp2 Ruling based on Risk Assessment
Healthcare-v4 SSp2:Environmental site assessmentposted by Donal Dignan on
Hi All, I'm working on a Healthcare v4 project that has detected iron in significant concentrations on the project site and it appears to possibly be a background contaminate but this is still bein
Have any projects earned this pilot credit 76 yet?
Pilot-Credits MRpc76:Material ingredient reportingposted by Michel Dedeo on
I'm curious about this Material Ingredient Reporting Credit, both PC76 and v4. Is there is a way to search existing projects for a specific credit to see which projects have earned it?
Filling the Minimum Performance Calculator for PAU-AHUs
CS-v4 EQp1:Minimum indoor air quality performanceposted by Thien Bui on
Hi all, I am working on a Core and Shell project. A Primary Air Handling (PAU) supplies 100% outdoor air to AHUs.
Modeling Heat Recovering Chillers for the Baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hello,
I want to know which the energy savings are comparing a Heat Recovery Air Cooled Chiller in the Proposed Building versus it´s equivalent in the Baseline Building.
Process Loads
NC-2009 EAp2:Minimum Energy Performanceposted by Paula Hernandez on
Hello,
I am modeling a winery and some of the chillers participate only to chilled and heat wine tanks.
MEPC's New Construction U-value cannot be changed?
NC-v4 EAp2:Minimum energy performanceposted by JAMES CHEN on
Recently, we will build a two-floors building made of metal material, but ROOF and WALL of MEPC's New Construction Nonresidential will automatically run U-0.273 and U-0.479, respectively.