Using a different Energy Consumption in EAc2 to EAc5 to reflect actual conditions
NC-v4 EAc5:Renewable energy productionposted by Tim Middleton on
We are working on a Manufacturing Project in Vietnam with very high non-regulated loads (around 75% of the total energy consumption).
Chilled water from on-site electric chiller plant
CS-v4 EAc3:Advanced energy meteringposted by Nuttanee Vongveeranonchai on
Hi all,
waste rooms
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
The project is located in Europe and standard EN 15251 is considered for the achievement of this prerequisite.
mineral based surface hardener
NC-v4 EQc2:Low emitting materialsposted by Agnieszka Rylska on
Hello,
impregnating agent based on silicate
NC-v4 EQc2:Low emitting materialsposted by Agnieszka Rylska on
Hello,
Non-Default Duration
CI-v4 WEc1:Indoor water use reductionposted by Chen Shalita on
Hi,
I am wondering if anyone has encountered a situation where are non-default flow duration (for example in a restroom faucet) would be applicable?
Thanks
Design Changes
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
I believe, In any case the proposed building can not be 100% as per design. There will be always variation regarding HVAC equipment selection (e.g.
PC Registration for Multiple Projects
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Brightworks Sustainability on
Hello,
Any feedback from those that have been through a full review of this ACP?
Pilot-Credits MRpc102:Legal Woodposted by Joanna Switzer on
Hi there,
Just curious - has anyone been through this ACP successfully?
Oops - broken chain of custody wood classification?
Pilot-Credits MRpc102:Legal Woodposted by Joanna Switzer on
Discovered in a project a little too late that FSC doors are being procured /handled by a non-FSC U.S.