Option 2. Natural land cover conditions (3 points except Healthcare, 2 points Healthcare)

CS-v4.1 SSc4:Rainwater Management
posted by  Ammar Yahia  on 

As we have 203,000 sqm site area within LEED boundary, with a majority of impervious roof, non-roof driveways, walkways, and landscape areas, basements extend on 100% of site area.

1
Wed Oct 9, 2024, 9:37 am

Best replicating natural site hydrology processes

NC-v4.1 SSc4:Rainwater Management
posted by  Allen Cornett  on 

If the rainwater that is captured and used for flush fixtures meets the percentile thresholds can this credit be successfully attemtped?  If the rainwater is used for the flush fixtures it wou

7
Sustainability specialist
Skanska Sweden
LEEDuser Basic Member
205 thumbs up
Thu Aug 1, 2024, 8:40 am

Single LEED building in Zoo: Demand Response Plan required for entire Zoo?

NC-v4 EAc4:Demand response
posted by  Joyce Kelly  on 

Wondering if the Demand Response Plan needs to address the entire Zoo the way Parking, Green Vehicles credits must.

1
Wed Jul 31, 2024, 9:26 pm

Energy Modelling Software

NC-v4 EAp2:Minimum energy performance
posted by  Eliane Krugman  on 

Hi everyone, 

I'm wondering what is the most common software for energy modelling ASHRAE 90.1

1
Fri Aug 2, 2024, 9:57 pm

Energy Star Commercial Washer

NC-v4.1 WEp2:Indoor Water Use Reduction
posted by  Michael Mantai  on 

We have a project that includes commercial washers.  The basis of design is a top load light commercial washer.  From the Energy Star website, a top load commercial washer is not eligible

4
Principal
Studio D Consulting + Design
LEEDuser Basic Member
5 thumbs up
Tue Jul 30, 2024, 9:30 pm

Select Different Options for Multi-Tenant Buildings?

EBOM-v4.1 MRc1:Purchasing
posted by  Kristina K  on 

Hello,

Can different options be selected under this credit if there are multiple tenants in the building?

0
2
Mon Jul 29, 2024, 9:16 pm

Including space in the the project boundary where only one trade is included in scope

CI-v4 MPR2:Must use reasonable LEED boundaries
posted by  Edgar Arevalo  on 

I have an ID+C project that takes up approximately half of a floor in a building.  When laying out the LEED project boundary, I was confused as to whether to include the restrooms, since it wa

0

Waste-to-Energy Clarification

NC-v4 MRc5:Construction and demolition waste management
posted by  Jenni Huynh  on 

Hi folks,

I had inquired about waste-to-energy as being counted towards waste diversion regarding the Construction + Demolition Waste Mgmt prereq/credit and GBCI said the following:

2
Default Avatar
TAKENAKA Europe GmbH
LEEDuser Basic Member
0 thumbs up
Mon Jul 29, 2024, 5:28 pm