Forum quick links
End use breakdown for tenants
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Gabriela Crespo on
Hi Guys!
Fresh air provision - Garment factory building
NC-2009 IEQp1:Minimum IAQ Performanceposted by Aravindraj RB on
Our project is a garment factory building (G+5), having majority floor area as production unit which is mechanically ventilated.
LCA on existing building
NC-v4 MRc1:Building life-cycle impact reductionposted by Emmanuel Pauwels on
The LEED reference guide for this credit states that the LCA option can only be used on new buildings or extensions to existing buildings.
Turf Grass Flooring
CI-v4 EQc2:Low emitting materialsposted by Michelle Rosenberger on
My project is interested in installing turf grass indoors. The product reads like flooring with treated yarns, solid backing, pile heights, etc.
LT Quality Transit Glitch?
NC-v4 LTc5:Access to quality transitposted by Lissa Spitz on
Hi, in the credits page when trying to mark the green check as ready for review, I get "This credit has threshold options and cannot be completed unless at least one option is select
Options for Shade or Indirect Sunlight
Healthcare-v4 SSc7:Places of respiteposted by Max Krueger on
Does the credit language of 1 seat per 200 feet refer to seating in shade or indirect sunlight? Or is this portion of the language in reference to seating in the total area of respite?
Easily Achieved
Pilot-Credits MRpc69:Construction and demolition waste managementposted by Emmanuel Pauwels on
We applied this credit in our Project in Athens in Greece and had no difficulty achieving it.