Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Surrounding Density - existing or approved buildings?

CS-v4 LTc4:Surrounding density and diverse uses
posted by  Sareet Benayahu  on 

My project is a high rise office building planned in an area that was previously industrial zone.

1
Mon May 7, 2018, 2:34 pm

Shower location

NC-v4 LTc6:Bicycle facilities
posted by  Thu Nguyen  on 

This credit requires that "Provide at least one on-site shower with changing facility for the first 100 regular building occupants and one additional shower for every 150 regular building occupants

1
Mon May 7, 2018, 3:01 pm

Multifamily Setpoints and Equipment Load

NC-v4 EAp2:Minimum energy performance
posted by  Cory Duggin  on 

Are we required to use the equipment loads and setpoints from the Energy Star Multifamily High Rise Simulation Guidelines?  I found that it is referenced by LEED for Homes, but I haven't found

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri May 4, 2018, 2:08 pm

How the fan efficiency W/cfm and pump efficiency W/gpm is decided in Ashrae 90.1?

CS-v4 EAp2:Minimum energy performance
posted by  Homer Wang  on 

Where or which book we can find about how the fan efficiency W/cfm and pump efficiency W/gpm is decided in Ashrae 90.1 just like what type building or how large build is considered and how long duc

3
Fri May 4, 2018, 2:05 pm

default visitor count for retail projects

Retail-NC-v4 LTc6:Bicycle facilities
posted by  Gail Napell  on 

we're doing a C+S with a retail lease space.  How do we determine the retail visitor count for this credit, WE, etc.?  i thought i saw this in v2009 but now i can't find it - can someone

0
1
Fri May 4, 2018, 2:16 pm
3
Thu May 3, 2018, 6:54 pm
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu May 3, 2018, 4:27 pm

Sharing Building-Level Energy Metering Data

NC-v4 EAc3:Advanced energy metering
posted by  Francis Hernández  on 

We have a LEED v4 project for the Corps of Engineers that is connected via the local installations BMS to a remote location for managing the buildings energy systems.  The meters and submeters

1
Thu May 3, 2018, 4:20 pm

Compliant laboratory and medical equipment

NC-v4 WEc2:Indoor water use reduction
posted by  LEED Pro Consultant  on 

For equipment such as steam sterilizer and sterile process washer, the requirement mentions liters/DIN tray, does the tray has to be any specific measure?

0