Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Bike Commuting - Lockable Changing Area

Retail-NC-v2009 SSc4:Alternative transportation
posted by  Lyle Axelarris  on 

The project has an employee locker room with an attached single ADA bathroom.  The bathroom is large enough to change in, and is lockable.  However, the door to the locker room is not loc

0

Preschool Occupancy

NC-2009 PIf3:Occupant and Usage Data
posted by  Heather Holdridge  on 

I received a preliminary design phase review comment on a preschool project for this PI form.  We entered identical values for the peak and average transient occupancy because the building is

3
Sustainability Director
Lake|Flato Architects
LEEDuser Basic Member
78 thumbs up
Thu Apr 12, 2018, 10:16 pm

Can a hotel+residential tower achieve this credit?

NC-2009 IEQc7.2:Thermal Comfort—Verification
posted by  Abena Darden  on 

I have a hotel + residential tower project with approx 50-50 break up. Can this project achieve Thermal Verification credit?

4
LEED AP BD&C
SDS Architects, Inc.
LEEDuser Basic Member
31 thumbs up
Thu Apr 12, 2018, 9:59 pm

signage verbage at electric car charging spaces

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Carrie Laurendine  on 

I feel like im seeing conflicting or vague stuff about the signage for this credit.

2
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Thu Apr 12, 2018, 9:15 pm

Harvesting storm water on a zero-lot-line project and discharging in a nearby canal

CS-v4 SSc4:Rainwater management
posted by  Costanza Della Torre  on 

Dear all,

I am not quite sure the approach we're using in a zero lot line project is correct to achieve this credit and would like to have your opinion.

1
Thu Apr 12, 2018, 8:13 pm

repositioned non-historic building in a historic DISTRICT

CS-v4 LTc3:High priority site
posted by  Gail Napell  on 

we're renovating a NON-HISTORIC building in a HISTORIC district.  new façade, new MEP systems, structural upgrades.  Does this meet the intent of Option 1?

 

1
Tue Dec 4, 2018, 8:02 pm
4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Apr 12, 2018, 3:26 pm

Furniture Category required to comply

CI-v4 EQc2:Low emitting materials
posted by  Michelle Rosenberger  on 

In the Step by Step guidance for Option1, one of the bullets says "furniture must be included, regardless of who specified or provided it." So does this mean that to achieve any low emitting pts, f

12
Thu Apr 12, 2018, 3:13 pm

Selection of SHW system for baseline

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

In the proposed system service hot water is heated in a water tank that is heated by a hot water loop that is connected with a gas boiler.

1
Thu Apr 12, 2018, 2:49 pm

Baseline Economizser Requirement for Data Center Rooms

NC-2009 EAc1:Optimize Energy Performance
posted by  Hirak Patel  on 

Hi, I am modeling Airport Traffic Control Tower project for LEED 2009 and I have question regarding economizer requirement. We have data center rooms which are served by CRAC units.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Thu Apr 12, 2018, 6:56 am