Forum quick links
Bike Commuting - Lockable Changing Area
Retail-NC-v2009 SSc4:Alternative transportationposted by Lyle Axelarris on
The project has an employee locker room with an attached single ADA bathroom. The bathroom is large enough to change in, and is lockable. However, the door to the locker room is not loc
Preschool Occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by Heather Holdridge on
I received a preliminary design phase review comment on a preschool project for this PI form. We entered identical values for the peak and average transient occupancy because the building is
Can a hotel+residential tower achieve this credit?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Abena Darden on
I have a hotel + residential tower project with approx 50-50 break up. Can this project achieve Thermal Verification credit?
signage verbage at electric car charging spaces
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Carrie Laurendine on
I feel like im seeing conflicting or vague stuff about the signage for this credit.
Harvesting storm water on a zero-lot-line project and discharging in a nearby canal
CS-v4 SSc4:Rainwater managementposted by Costanza Della Torre on
Dear all,
I am not quite sure the approach we're using in a zero lot line project is correct to achieve this credit and would like to have your opinion.
repositioned non-historic building in a historic DISTRICT
CS-v4 LTc3:High priority siteposted by Gail Napell on
we're renovating a NON-HISTORIC building in a HISTORIC district. new façade, new MEP systems, structural upgrades. Does this meet the intent of Option 1?
Furniture Category required to comply
CI-v4 EQc2:Low emitting materialsposted by Michelle Rosenberger on
In the Step by Step guidance for Option1, one of the bullets says "furniture must be included, regardless of who specified or provided it." So does this mean that to achieve any low emitting pts, f
Selection of SHW system for baseline
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
In the proposed system service hot water is heated in a water tank that is heated by a hot water loop that is connected with a gas boiler.
Baseline Economizser Requirement for Data Center Rooms
NC-2009 EAc1:Optimize Energy Performanceposted by Hirak Patel on
Hi, I am modeling Airport Traffic Control Tower project for LEED 2009 and I have question regarding economizer requirement. We have data center rooms which are served by CRAC units.