Forum quick links
air transfer
NC-v4 EQp1:Minimum indoor air quality performanceposted by Agnieszka Rylska on
On our project we have a few spaces like corridors and break rooms with kitchen area which don't have a direct ducted air supply from the AHU (CAV system).
NC-v4 MRc5 Option 2: Clarification of floor area for multi-phase renovation project.
NC-v4 MRc5:Construction and demolition waste managementposted by Yasha Ogg on
I am working on a multi-phase project and I was wondering, does Option 2: Reduction of total waste material (Do not generate more than 2.5 pounds of construction waste per square foot of the b
Enhanced Commissioning in District energy Systems (DES) with Combined Heat and Power (CHP) plant
NC-2009 EAc3:Enhanced Commissioningposted by Ricardo Sá on
We are certifying a project that is being developed in a site that comprises a District Energy System based on a Combined Heating and Power Plant (DES-CHP).
Alternative Complaince for large energy user
NC-v4 EAp2:Minimum energy performanceposted by Vipul Babriya on
Hello,
High-Reflectance Roof
NC-v4 SSc5:Heat island reductionposted by Cora Kenrick on
Hi Fellow LEED Users,
Am I correct in saying that for a High-Reflectance Roof, a roof full of PV can not be consider? As SRI works different with PV.
Define "Weekend Trips
CS-v4 LTc5:Access to quality transitposted by Susan Di Giulio on
We are working on an Office Tower in the center of Salt Lake City.
foundation walls and footings
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Ilana Judah on
How are these calculated for this credit? As a continuation of the exterior wall? Thanks.
Area not in scope of project
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Carl Rappa on
We have a renovation & addition project where the CM wants to do the Option 2: Air Testing to achieve IEQc3.2.
Requirements of section 5.4.3.4 of ASHRAE 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by Maurizio Sabatino Pirocchi on
Hi,
I have a question concerning requirements of section 5.4.3.4 of ASHRAE 90.1-2007.
U-values for mixed-use building
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
For the baseline model relative to a building where a part is residential (4 floors) and another part nonresidential (ground floor), shall the envelope of the nonresidential part respect the U-valu