air transfer

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Agnieszka Rylska  on 

On our project we have a few spaces like corridors and break rooms with kitchen area which don't have a direct ducted air supply from the AHU (CAV system).

0

NC-v4 MRc5 Option 2: Clarification of floor area for multi-phase renovation project.

NC-v4 MRc5:Construction and demolition waste management
posted by  Yasha Ogg  on 

I am working on a multi-phase project and I was wondering, does Option 2: Reduction of total waste material (Do not generate more than 2.5 pounds of construction waste per square foot of the b

1
Wed Apr 11, 2018, 1:23 pm

Enhanced Commissioning in District energy Systems (DES) with Combined Heat and Power (CHP) plant

NC-2009 EAc3:Enhanced Commissioning
posted by  Ricardo Sá  on 

We are certifying a project that is being developed in a site that comprises a District Energy System based on a Combined Heating and Power Plant (DES-CHP).

0
9
Wed Apr 11, 2018, 7:47 am

High-Reflectance Roof

NC-v4 SSc5:Heat island reduction
posted by  Cora Kenrick  on 

Hi Fellow LEED Users,

 

Am I correct in saying that for a High-Reflectance Roof, a roof full of PV can not be consider? As SRI works different with PV.

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Wed Apr 11, 2018, 2:36 am

Define "Weekend Trips

CS-v4 LTc5:Access to quality transit
posted by  Susan Di Giulio  on 

We are working on an Office Tower in the center of Salt Lake City.

1
Wed Apr 11, 2018, 11:53 pm

foundation walls and footings

NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roof
posted by  Ilana Judah  on 

How are these calculated for this credit? As a continuation of the exterior wall? Thanks.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Tue Apr 10, 2018, 9:11 pm

Area not in scope of project

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Carl Rappa  on 

We have a renovation & addition project where the CM wants to do the Option 2: Air Testing to achieve IEQc3.2.

0

Requirements of section 5.4.3.4 of ASHRAE 90.1-2007

NC-2009 EAp2:Minimum Energy Performance
posted by  Maurizio Sabatino Pirocchi  on 

Hi,

I have a question concerning  requirements of section 5.4.3.4 of ASHRAE 90.1-2007.

1
Tue Apr 10, 2018, 3:33 pm

U-values for mixed-use building

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

For the baseline model relative to a building where a part is residential (4 floors) and another part nonresidential (ground floor), shall the envelope of the nonresidential part respect the U-valu

1