Forum quick links
ASHRAE 90.1 Appendix G Fan Power Calculator
NC-v4 EAp2:Minimum energy performanceposted by Marcus Sheffer on
7group has updated their baseline fan power calculator to include ASHRAE 90.1-2010, 2013 and 2016 baseline fan power calculations. You can download it for free in the Documentation Toolkit tab.
Fresh air needs in server rooms for data center
Data-Centers-NC-v4 EQp1:Minimum indoor air quality performanceposted by Jose Antonio Kovacevic on
Hello,
In order to assess compliance of a Data Center with prerrequisite EQp1 and credit EQc1, I would like to know how we should calculate fresh air needs for the server rooms.
Major renovation - new construction
NC-v4 EAp2:Minimum energy performanceposted by Maria Perzon on
What is the definition of major renovation for this credit?
Speculative warehouse
CS-v4 IPc1:Integrative processposted by MARIA ESTHER LAMADRID on
Can integrative process credit be attempted for speculative projects where all the interior will be done by the tenant and almost everything is left in the lease agreement for the tenant to comply.
Dwelling Unit
NC-v4 LTc4:Surrounding density and diverse usesposted by Badr Darwich on
What is the minimum size required for a student residential room (Dorms) to be called a dwelling unit?
Lactation Room WEp1 Sink Calcs
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Rob Hink on
We have a NC project that has a lactation room with a sink in the room of a cruise terminal. There will be 345 FTEs and 7,000+ Visitors on a daily basis.
ASHRAE 90.1-2010 Baseline Fan Power Calculator
CS-v4 EAc2:Optimize energy performanceposted by Ciaran McCabe on
Hi,
As anyone got a Baseline Fan Power Calculator for ASHRAE 90.1 2010 like what was available for 90.1 - 2007 created by the 7 group ?
90.1 2010: V4: Baseline Lighting Control
NC-v4 EAp2:Minimum energy performanceposted by Adrien Dumolard on
Hello, I work on my first PRM. In the 9.4.1.2 mandatory provisions, the standart say: "The controlled lighting shall have at least one control step between 30% and 70% (inclusive) of full lighting
WEc1 Thresholds Tab
NC-2009 WEc1:Water Efficient Landscapingposted by H M on
Within the WEc1 "Thresholds" tab, there is a green button that reads "Submit". Are you supposed to click this button in order for the credit to be ready for review?