Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

ASHRAE 90.1 Appendix G Fan Power Calculator

NC-v4 EAp2:Minimum energy performance
posted by  Marcus Sheffer  on 

7group has updated their baseline fan power calculator to include ASHRAE 90.1-2010, 2013 and 2016 baseline fan power calculations. You can download it for free in the Documentation Toolkit tab.

0

Fresh air needs in server rooms for data center

Data-Centers-NC-v4 EQp1:Minimum indoor air quality performance
posted by  Jose Antonio Kovacevic  on 

Hello,

In order to assess compliance of a Data Center with prerrequisite EQp1 and credit EQc1, I would like to know how we should calculate fresh air needs for the server rooms.

0

Major renovation - new construction

NC-v4 EAp2:Minimum energy performance
posted by  Maria Perzon  on 

What is the definition of major renovation for this credit?

1
Thu Apr 5, 2018, 2:07 pm

Speculative warehouse

CS-v4 IPc1:Integrative process
posted by  MARIA ESTHER LAMADRID  on 

Can integrative process credit be attempted for speculative projects where all the interior will be done by the tenant and almost everything is left in the lease agreement for the tenant to comply.

1
Wed Apr 4, 2018, 10:32 pm

Dwelling Unit

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Badr Darwich  on 

What is the minimum size required for a student residential room (Dorms) to be called a dwelling unit?

3
Wed Apr 4, 2018, 7:37 pm

Lactation Room WEp1 Sink Calcs

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Rob Hink  on 

We have a NC project that has a lactation room with a sink in the room of a cruise terminal. There will be 345 FTEs and 7,000+ Visitors on a daily basis.

1
Wed Apr 4, 2018, 8:57 pm
1
Wed Apr 4, 2018, 9:01 pm

ASHRAE 90.1-2010 Baseline Fan Power Calculator

CS-v4 EAc2:Optimize energy performance
posted by  Ciaran McCabe  on 

Hi,

As anyone got a Baseline Fan Power Calculator for ASHRAE 90.1 2010 like what was available for 90.1 - 2007 created by the 7 group ? 

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Apr 4, 2018, 2:28 pm

90.1 2010: V4: Baseline Lighting Control

NC-v4 EAp2:Minimum energy performance
posted by  Adrien Dumolard  on 

Hello, I work on my first PRM. In the 9.4.1.2 mandatory provisions, the standart say: "The controlled lighting shall have at least one control step between 30% and 70% (inclusive) of full lighting

3
Director
Passive Dynamics Sustainability Consultants
LEEDuser Basic Member
12 thumbs up
Wed Apr 4, 2018, 1:31 pm

WEc1 Thresholds Tab

NC-2009 WEc1:Water Efficient Landscaping
posted by  H M  on 

Within the WEc1 "Thresholds" tab, there is a green button that reads "Submit". Are you supposed to click this button in order for the credit to be ready for review?

0