Forum quick links
DHW Flow
NC-2009 EAp2:Minimum Energy Performanceposted by Jorge Lopez de Obeso on
Hi, I'm having a hard time trying to estimate my DHW Flow in the energy model for a residential project.
Are hotels considered "residential" or "nonresidential"?
ND-v2009 NPDp2:Compact developmentposted by Rebecca Shea on
Hello, I am trying to determine how hotels should be treated when calculating density. I see that the definition for "dwelling unit" specifically does not include hotel rooms.
Entryway mats required for a dorm that has apartments on the first floor?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Sue Bryant on
We have a dorm project that has 4 apartments on the first floor for hall directors. These have their own private exterior entry. There is no further guidance for residential projects.
Method for modeling sensor nodes to control automatic blinds.
NC-v4 EQc7:Daylightposted by Par Bratt on
Hi,
According to the LEED interpretation (ID# 100002149). One is exempt from the ASE criteria (<10%) if incorporating interior automated window blinds or shades.
What is Required to become a CxA
NC-v4 EAc1:Enhanced commissioningposted by Lucas McGill on
Hello, I have a little experience with performing commissioning on mechanical and electrical systems in buildings, but never on a LEED project. I've read that:
EPDs for furniture
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by lucy crane on
Looking at this from a manufacturer's point of view, which 3rd parties can verify EPDs? Trying to see what furniture needs to comply to the standard.
ISO 14024 Type I ecolabels
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Cristina Roson on
Hi you all, We have a project which is going to pursue both LEED and BREEAM ES cetifications (BREEAM ES as the spanish adaptation for BREEAM).
Requirements for paints and coatings applied on other elements than walls, floors and ceilings
NC-v4 EQc2:Low emitting materialsposted by Agnieszka Rylska on
Hello,
Commercial refrigeration savings (process energy )
CS-v4 EAc2:Optimize energy performanceposted by Ricardo Sá on
Hi,
Is there a minimum period required for joint-use
Schools-2009 SSc10:Joint Use of Facilitiesposted by Ward Miller on
The school is not in session for 16 weeks of the year and the entire campus and all facilities are with little to no use. Only several security, cleaning staff and administrators are pres