NC-v4 MPR1:Must be in a permanent location on existing landposted by Cora Kenrick on
Hi Ladies & Gentlemen,
I'm new to LEED and VERY new to submission...I will be completing my first submission soon.
NC-2009 PIf3 - Occupant and Usage Data
NC-2009 PIf3:Occupant and Usage Dataposted by Felicia Ridgeway on
My new construction administrative office building project (federal project on a secure military base) has 750 full-time occupants (8 hour work day), 300 part-time occupants (4 hour work day), and
Option 2 ASHRAE 50% AEDG - Equipment type not listed
NC-v4 EAp2:Minimum energy performanceposted by Megan Gilman on
I have a project in Climate Zone 6, which is trying to use Option 2 under the prescriptive path, using the 50% AEDG for Small to Medium Office Buildings. They'd like to avoid the ASHRAE 90.1
Can the APPA Audit be modified for hotel spaces?
EBOM-v4 EQc6:Green cleaning - custodial effectiveness assessmentposted by Ana Hagerup on
The percentage of APPA Space Categories (i.e. break room, conference room, copy/mail room, etc.) are specific to office buildings.
Temperature and Humidity Monitoring During Flush
CI-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Nancy Henderson on
Is it part of the requirement of this credit to monitor temperature and humidity in the space during the flush out - or is it sufficient to provide the temperature set points and calculate the resu
Reclaimed water use
NC-v4 WEc1:Outdoor water use reductionposted by Ann Runley Carroll on
If I am using all reclaimed/recycled water, do I still need to use the calculator. Where do I download the calculator? By using reclaimed/recycled water, do I get 2 points?
Previously Developed Site vs. Prime Farmland
NC-2009 SSc1:Site Selectionposted by Jennifer Carlson on
I have a site that is currently on previously developed site. Utilities, sidewalks, etc are already in place. However the Soil Survey says the land the is prime farmland if drained.
Additional Baseline System for pre-cooled spaces
CS-v4 EAp2:Minimum energy performanceposted by Przemysław Rejczak on
Dear Everyone
Brick and rubble in soil
NC-v4 MRc5:Construction and demolition waste managementposted by Marilyn Specht on
We are working on a LEED v4 project in an urban core. We are targeting 2 points for MRc5 and have an aggressive Construction & Demolition Waste Management Plan underway.