Forum quick links
CHANGING FIXTURES IN THE CONSTRUCTION PHASE
CS-v4 WEp2:Indoor water use reductionposted by Belén Valladares López on
Hi everybody
We are in the construction phase of a project and the design phase has been already reviewed by USGBC
Dual Car Chargers
NC-v4 LTc8:Green vehiclesposted by Michelle Rosenberger on
The reference manual narrative is looking for charging stations "in" 2% of all parking spaces and the online form is definitely looking for a number of spaces being served by charging stations.
Biobased materials - Manufacturer declared conformance
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Danna Richey on
We have a project on which we're using a large amount of wool, and we'd like to be able to take credit for biobased materials. Since we're unable to find any
Densely occupied spaces calculation
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Mike D on
If a space is smaller than 100 square feet, can it also be classified as densely occupied? We have many meeting rooms which are smaller than 100 square feet but that have high expected occupancy.
Fuel tank room exhaust
NC-2009 IEQp1:Minimum IAQ Performanceposted by Manuel Martin Delgado on
Hello,
Sensor Faucets
NC-v4 WEp2:Indoor water use reductionposted by Jennifer Rennick on
In prior versions of LEED, sensor faucets were given a credit for reducing hand washing duration from 15 seconds to 12 seconds.
ASE criteria fulfilled with automated dynamic façade
NC-v4 EQc7:Daylightposted by Ricardo Sá on
Hi,
Reuse of rainwater for irrigation
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Aneta Firląg on
Hello, on our project the runoff from roof area is directed to one concrete reservoir tank. Water is stored in rainwater cistern and reused for irrigation.
Office/Industrial Mix - AEDG for Small to Medium Office Buildings
CI-v4 EAc2:Optimize energy performanceposted by Martin Meehan on
Hello
I am working a building which is part office (30% of building area) and light industrial (70% of building area).
The overall area is approx 3000 m2.