Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Lighting control in prison cells

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Sananda Mukherjee  on 

There are 3 levels of lighting that the lighting can adjust to within the prison cells in a jail but the inmates will not have the capability to control their own lighting, the controls w

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Mon Mar 5, 2018, 2:56 pm

Private / Public Fixtures for Outpatients

Healthcare-v2009 WEp1:Water use reduction
posted by  CT G  on 

We are working on a clinic which was both inpatients and outpatients.

0
2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Mon Mar 5, 2018, 12:28 pm

Option 1 Accessible Floor or Ceiling

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Jonathan Weiss  on 

Anyone with experience on how this option works?  For a project where we have acoustical ceiling systems over more than 50% of the ceilings, does this apply?  How do we define "not entang

0

What's up with LEED v4 version of School as a Teaching Tool?

Schools-2009 IDc3:The School as a Teaching Tool
posted by  Nadav Malin  on 

Does anyone know what's going on with the v4 version of this credit? In 2009/v3 it was clearly its own credit, but in v4 it seems to be in limbo. 

0

Great new zero-energy school video available

Schools-2009 IDc3:The School as a Teaching Tool
posted by  Nadav Malin  on 

We're really proud of this video we (at BuildingGreen) created for the U.S. Department of Energy with Storyshop Films.

0

Using ASHRAE 90.1-2013 as reference standard for v4 projects

Schools-NC-v4 EAc2:Optimize energy performance
posted by  Gail Vittori  on 

For v4 projects, is there any adjustment in point allocation for projects using 90.1-2013 ILO 90.1-2010?

1
Mon Mar 5, 2018, 3:42 pm

Assessment Influence on Design

NC-v4 SSc1:Site assessment
posted by  Summer Minchew  on 

My question ties back to the FAQ response: "The credit requires that projects assess each feature, but it does not require that every assessment influence the project design." This credit was denie

1
Wed Jan 2, 2019, 6:35 pm