EBOM templates

Pilot-Credits IPpc88:LEED O+M Starter Kit
posted by  Pia Öhrling  on 

The EBOM templates are really lousy. The reviewers love them and it is really difficult to get a plan/policy approved if you do not follow the template.

0
2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Feb 21, 2018, 12:24 am

Garden and Recreation space

NC-v4 SSc3:Open space
posted by  Jonelle Humphrey  on 

If I were designing a two-way running path, with each direction of travel to be separated by a (narrow) raised garden bed along the edge of my site, would this area count towards "garden space

1
Wed Feb 21, 2018, 12:59 am

LEED ND v4 MPR2 project area

ND-v4 MPR2:Must use reasonable LEED boundaries
posted by  wenting ding  on 

We are considering applying for a LEED ND cergification.

0

Automatic Receptacle Control

CI-v4 EAp2:Minimum energy performance
posted by  Erik Camacho  on 

EAp2 has an mandatory ASHRAE requirement (90.1-2010, Section 8.4.2 Automatic Receptacle Control) requiring at least half of all private offices, open offices, and computer classrooms to be controll

2
LEEDuser Basic Member
4 thumbs up
Tue Feb 20, 2018, 11:24 am

Additional requirements - Guarantees of Origin (GOs)

NC-2009 EAc6:Green power
posted by  Jens Apel  on 

The European ACP for EAc6 states: "Guarantees of Origin (GOs) are an acceptable equivalent to the Green-e program for electricity if additional requirements are met with regards to location of powe

3
Mon Feb 19, 2018, 10:29 am
1
Tue Feb 20, 2018, 7:23 pm

Wood Tables made for a retail Project

Retail-CI-v4 EQc2:Low emitting materials
posted by  Cindy Davis  on 

My retail project is having cafe tables made by the owners millwork company that would have metal legs and a wood top.  If the wood met the requirements of the composite wood VOC (CA