LEED EBOM for a Single Tenant Building
Warehouses-EBOM-v4 MPR1:Must be in a permanent location on existing landposted by Bernardo Frias Bouchez on
Dear all,
We have a prospect client who is interested in certifying his Light Industrial building of 40,000 m2.
EA Enhanced refrigerant management
NC-v4 EAc6:Enhanced refrigerant managementposted by Loic Angot on
Project location : Canada
Project type : factory
Hi,
DES Path 1
NC-v4 EAc7:Green power and carbon offsetsposted by Francesco Passerini on
The Reference Guide at p. 460 states:
"For any projects using energy model Path 1, green power and offsets used in a DES do not contribute toward the credit for connected building".
Hydrozones
NC-v4 WEp1:Outdoor water use reductionposted by Charles Hall on
I am a little unsure about how to generate hydrozone areas. For instance, with a group of trees, do I draw a polygon around the probable drip line and use that as an area?
Reasonable Boundary - other support builidngs beyond project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Nicole Kimoto on
We have a hangar project with an admin building attached all new construction. Does the boundary only need to include the construction that will do with the hangar/admin only?
Resinous Floor VOC requirement
Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Todd Bundren on
Does anyone know what the VOC requirements are for a Resinous Floor system?
Variable Flow Showerhead
NC-v4 WEc2:Indoor water use reductionposted by Risto Beatty on
My project is specifying shower-heads that allow the user to adjust the flow rate between 0.5 GPM, 1.0 GPM, and 1.5 GPM.
Charging station being networked to encourage off-peak charging
NC-v4 LTc8:Green vehiclesposted by ERM Korea on
Hi. I would like to ask on the requirement of EVSE.
Prescriptive pathway
Homes-v4 EAp1:Minimum energy performanceposted by Gustavo De las Heras Izquierdo on
Hallo,
RE split between on site production and lease agreement
NC-v4 EAc5:Renewable energy productionposted by Jason Garvens on
Can a project split the source of renewable energy used on site between their own on site system and making up the rest through a purchase agreement with a community RES?
Example: