Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LEED EBOM for a Single Tenant Building

Warehouses-EBOM-v4 MPR1:Must be in a permanent location on existing land
posted by  Bernardo Frias Bouchez  on 

Dear all,

We have a prospect client who is interested in certifying his Light Industrial building of 40,000 m2. 

0

EA Enhanced refrigerant management

NC-v4 EAc6:Enhanced refrigerant management
posted by  Loic Angot  on 

Project location : Canada

Project type : factory

Hi, 

1
Wed Jun 20, 2018, 11:02 pm

DES Path 1

NC-v4 EAc7:Green power and carbon offsets
posted by  Francesco Passerini  on 

The Reference Guide at p. 460 states:

"For any projects using energy model Path 1, green power and offsets used in a DES do not contribute toward the credit for connected building".

2
Wed Feb 14, 2018, 5:33 pm

Hydrozones

NC-v4 WEp1:Outdoor water use reduction
posted by  Charles Hall  on 

I am a little unsure about how to generate hydrozone areas. For instance, with a group of trees, do I draw a polygon around the probable drip line and use that as an area? 

1
Tue Feb 14, 2023, 4:02 pm

Reasonable Boundary - other support builidngs beyond project

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Nicole Kimoto  on 

We have a hangar project with an admin building attached all new construction. Does the boundary only need to include the construction that will do with the hangar/admin only?

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed Feb 14, 2018, 10:18 am

Resinous Floor VOC requirement

Schools-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Todd Bundren  on 

Does anyone know what the VOC requirements are for a Resinous Floor system? 

1
Wed Feb 14, 2018, 11:31 am

Variable Flow Showerhead

NC-v4 WEc2:Indoor water use reduction
posted by  Risto Beatty  on 

My project is specifying shower-heads that allow the user to adjust the flow rate between 0.5 GPM, 1.0 GPM, and 1.5 GPM.

1
Tue Feb 13, 2018, 9:37 pm

Charging station being networked to encourage off-peak charging

NC-v4 LTc8:Green vehicles
posted by  ERM Korea  on 

Hi. I would like to ask on the requirement of EVSE.

 

1
Tue Feb 13, 2018, 7:20 am

RE split between on site production and lease agreement

NC-v4 EAc5:Renewable energy production
posted by  Jason Garvens  on 

Can a project split the source of renewable energy used on site between their own on site system and making up the rest through a purchase agreement with a community RES?

Example:

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Feb 12, 2018, 9:47 pm