Hi I've been working on a project where I want to purse this pilot credit.
Monitoring-based commissioning
NC-v4 EAc1:Enhanced commissioningposted by Paula Rantanen on
In our project building, we have many measurement points that do not measure energy consumption directly but the energy consumption can be reliably calculated from the tracked data and the building
Which flow rates to use?
NC-v4 WEp2:Indoor water use reductionposted by Nate Tsang on
Hi all, The prerequisite lists the baseline flow rates at 60psi (415 kPa). Does this mean that the proposed flow rate must also be at 60psi?
Solid Untreated Wood Window Sills
NC-v4 EQc2:Low emitting materialsposted by Alara Brinton on
We have a project installing solid wood, (untreated) for the window sills & some baseboards.
Signage at Equipment Rooms with Exterior-Only Access
NC-v4 EQp2:Environmental tobacco smoke controlposted by Stephanie Graham on
My project is a fleet maintenance garage with storage. Per prerequisite requirements we are providing the no-smoking signage at all building openings including intakes, overhead doors and oth
IPMVP Option D+ PV System
NC-2009 EAc5:Measurement and Verificationposted by Nasim Mirian on
Hello,
Waste-to-Energy
NC-v4 MRc5:Construction and demolition waste managementposted by Lise Dannesboe on