Rainwater management

NC-v4 SSc4:Rainwater management
posted by  SAMY Chamy  on 

Dear Concern:-

1
Tue Jan 2, 2018, 4:16 pm

Alternative Compliance Path for Fundamental Commissioning

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by     on 

Due to an elongated project and construction schedule we'd like to use an alternative compliance path for EAp1 Fundamental Commissioning under LEED NC v2.2.

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Sun Dec 31, 2017, 8:23 pm

Properties Partially within 1/4 mile Radius

CI-v4 LTc2:Surrounding density and diverse uses
posted by  Bonnie Peters  on 

Is only the portion of a property that is within the 1/4 mile radius calculated, or the entirety property?  I have a few large, low-density parcels that perhaps only about 10% of is

1
Wed Jan 3, 2018, 11:10 pm

Guide Language

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  PAWAN DAHIWAL  on 

Under several material credits its mentioned that "Procure 20 different permanently installed item from 5 different manufacturer"...for EPD/CSR My question is, 1) To meet the requirement under th

5
Sustainability Project Manager
Atkins
LEEDuser Basic Member
59 thumbs up
Fri Dec 29, 2017, 12:20 pm

Minimum 18% energy saving after April 2016 - Scoring

NC-2009 EAc1:Optimize Energy Performance
posted by  Eric Claycamp  on 

My project will likely reach 20% to 23% Energy Savings. Does this mean I can only score the points after I meet the minimum? In other words is a 20 percent reduction only one credit point?

3
Thu Dec 28, 2017, 4:02 pm
3
Default Avatar
LEEDuser Expert
472 thumbs up
Thu Dec 28, 2017, 2:40 pm

Break Rooms

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Bill Swanson  on 

I see that this has been asked before and there have been LEED Interpretations (10263) on this topic.  But I think they are wrong.  Specifically the ruling that says, "Note that only

1
Tue Dec 26, 2017, 9:26 pm

Meeting ASHRAE 90.1 COP Requirement in Proposed Case Energy Simulation

NC-2009 EAp2:Minimum Energy Performance
posted by  Sasha Peters  on 

We recently received a comment from USGBC LEED that we have to meet ASHRAE 90.1 COP requirement in proposed case energy simulation as well.

1
Tue Dec 26, 2017, 6:11 pm

Different GPF for two WC's in same fixture group

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Razan Nejem  on 

In an office building the the public restrooms have two kinds of Dual Flush WC's with different gpf, one WC has 0.79 gpf and the other one has 0.82 gpf.