Pipe Thread Compound

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Maura Adams  on 

In what category would this product be?

4
Mon Dec 18, 2017, 5:06 pm

1/4 mile radius cuts through building...

NC-v4 LTc4:Surrounding density and diverse uses
posted by  Alara Brinton  on 

The edge of my 1/4 mile radius cuts half way through a couple buildings...would I include half the area in my density calculations, whole, or not include the building at all? 

4
Sun Dec 17, 2017, 9:57 pm

Energy Simulation Baseline

CS-2009 EAc1:Optimize Energy Performance
posted by  Yong Lee Low  on 

Hi, i'm working on an office building of 95,000sqm using a District Cooling System (DCS). I am using the HAP E20 software for simulation.

1
Mon Dec 18, 2017, 3:39 pm

ACCESS TO QUALITY TRANSIT

NC-v4 LTc5:Access to quality transit
posted by  jade dayday  on 

hi,

is it possible to earn a credit if our project offers a free ride to all occupants from the entrance to the nearest rideshare stop?

thank you.

1
Wed Mar 21, 2018, 6:41 pm

Can the Projects Fundamental CxA be an employee of the Mechanical Design firm, but not part of MEP Design Team?

NC-v4 EAp1:Fundamental commissioning and verification
posted by  marc myers  on 
  • The CxA may be a qualified employee of the owner, an independent consultant, or an employee of the design or construction firm who is not part of the project’s design or construction team, o
5
Fri Dec 15, 2017, 5:48 pm

brownfield confusion

NC-v4 LTc3:High priority site
posted by  Larry Sims  on 

Okay, I'll start this off by stating the requirement, and then asking a (simple) question. LEED v4 requirement: Locate on a brownfield where "soil or groundwater contamination has been identified"

6
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Fri Dec 15, 2017, 5:41 pm

How to Perform fundamental commisiioning and verification of VRF System?

NC-v4 EAp1:Fundamental commissioning and verification
posted by  JASON NIEN  on 

we have a VRF(Variable Refrigerant Flow​) system for air conditioning . if we want to execute commissioning , how can i do this credit ? how to verify VRF system performance? thanks .

1
Fri Dec 15, 2017, 6:39 pm

Irrigation controller - WaterSense

NC-v4 WEp1:Outdoor water use reduction
posted by  Ricardo Sá  on 

Dear All,

Our project is located in Portugal and the project team is intendend to install a WaterSense irrigation controller.

1
Mon Jan 15, 2018, 10:39 pm

EPD Language

CS-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Ward Miller  on 

Our project will be supplied bricks from Austria and potentially rebar from Turkey or Bosnia and Herzegovina.

1
Sat Mar 24, 2018, 8:24 pm