Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EAc6 form

NC-v4 EAc6:Enhanced refrigerant management
posted by  Jens Apel  on 

Does anyone have access to a working LEED Online template? My project is in precertification, forms not yet available.

4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Fri Dec 15, 2017, 8:39 am

NC-v4 EQc1 - Enhanced indoor air quality strategies

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  SAJJAD MALIK  on 

Dear All,

Can we achieve the enhance indoor air quality strategies point by using 100% fresh air unit without using filtration media in large working halls.

1
Mon Jan 15, 2018, 9:53 pm

O+M Starter Kit for CI

CI-v4 INc1:Innovation
posted by  Kristen Magnuson  on 

Our CI project Owner is occupying 100% of the building, including core space. They are also responsible for operations and maintenance practices. However, they are do not own the building.

1
Thu Dec 14, 2017, 10:59 pm

EU Standards vs LEED

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Tanja Arnesson  on 

EU Standards vs LEED We have some problem with the VOC (g/l) content in our products.

7
Thu Dec 14, 2017, 8:12 pm

Service Sink Baseline flow

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Jorge Torres-Coto  on 

I have a project that includes mainly Vocational Classrooms.  As such, each classroom has Service Sink for washing hands after each class (Diesel, Auto Mechanic, Carpentry, Welding, Sheet Meta

0

Pipe insulation sealant???

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Edgar Arevalo  on 

I'm trying to figure out, under what category would pipe insulation joint sealant fall under?

0

Retail -Clarifying Reference Guide language indicating "14 days"

Retail-CI-v4 EQc4:Indoor air quality assessment
posted by  Stacey Olson  on 

The LEED reference guide indicates "Retail projects may conduct the testing within 14 days of occupancy." I read this to mean that air sampling can occur up to 14 days post occupancy.

0

Using Default Roof Material SRI values

NC-v4 SSc5:Heat island reduction
posted by  Lauren Sparandara  on 

Hello - I noticed that there are default SRI values available for use for the ground SRI values through CIR #10411 - just as was done for LEED 2009 - are there some default values that can be

3
Thu Dec 14, 2017, 5:25 pm

NC-v4 MR

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Lissa Spitz  on 

Can anyone clarify the following section from p469 of the ref guide?  It seems to be saying only include MEP materials that are credit compliant in calculations.

2
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Thu Dec 14, 2017, 3:23 pm