Hi. Can some one from the

NC-2009 IDc2:LEED Accredited Professional
posted by  Neetika Parmar  on 

Hi. Can some one from the project team become certified when project construction is completed to achieve this credit.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Thu Nov 30, 2017, 3:42 pm

Exemptions or lower limits : Art Galeries (Museum) ?

NC-v4 EQc7:Daylight
posted by  Marilou Communeau  on 

Hello, I have a technical question about the credit Daylight for a Museum (with art galleries, offices, restaurant).

1
Fri Feb 23, 2018, 7:57 pm

LEED CI project boundary

CI-2009 PIf1:Minimum Program Requirements
posted by  Drashti Dhirwani  on 

I am working on a 125,000 SF CI project, where approximately 2,500 SF space (2 private offices and a kitchen) was designed by a different designer, has a different contractor and is being cons

0

LEED Compliant Faucets

NC-v4 WEp2:Indoor water use reduction
posted by  Ann E  on 

Hi,

Any list of suppliers who can provide a LEED Compliant Faucets?

 

 

10
Default Avatar
LEEDuser Basic Member
1 thumbs up
Wed Nov 29, 2017, 2:39 am

Change to Furniture Evaluation Criteria

NC-v4 EQc2:Low emitting materials
posted by  Ian Thompson  on 

There was a rating system correction at the end of January http://www.usgbc.org/node/10611490 which seems to reduce the value of a Furniture Evaluation complying to Section 7.6.1 of ANSI/BIFMA e3 –

4
Tue Nov 28, 2017, 8:18 pm

GHG vs. Virtual Rate

Pilot-Credits EApc95:Alternative Energy Performance Metric
posted by  Kelly Gearhart  on 

Any experience out there finding that virtual rate produces better results than GHG?

0

Minimum Energy Performance and moduline units

CI-v4 EAp2:Minimum energy performance
posted by  Scott Harbaugh  on 

The facility in which we are designing a 20,000+ square foot office space project is served by the old Carrier moduline units.  Is it possible to get EQ prerequisite Minimmum Energy Performanc

1
Tue Nov 28, 2017, 4:55 pm

Architectural Design Guideline for LEED platinum Project under CORE & SHEEL V4

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Subrota Roy  on 

Hi,

We are going to start Architectural drawing design of one project. ( Project targeted rating level PLATINUM Under CORE & SHEEL V4)

Project data as follows :

1
Mon Oct 15, 2018, 7:43 pm

Perimeter controls for urban projects

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Max Zayika  on 

What are the most widely used types of perimter sediment controls for urban projects (with existing hard site paving)?

0