Forum quick links
greenroofs soils
NC-v4 SSc2:Site development - protect or restore habitatposted by Ricardo Sá on
Dear All,
Office Building with Data Center
NC-2009 EAc1:Optimize Energy Performanceposted by Lise Dannesboe on
I have a possible case with a office building that also contains a large Data Center.
green wall
CS-2009 IDc1:Innovation in Designposted by Daniela Castro Salgado on
I'm sure I read somewhere that including green walls in the project can help us earn an Innovation in Design point if it complies with a certain percetange of the building's footprint area.
Requirement of entryway system
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Yan-Chuan Chen on
I am currently working on a residential building. For LEED V2009, the requirement of the permanent entryway system should have 3m long in the primary direction of travel.
Shell with no energy or metering systems
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Martin Meehan on
Hello
My project is to be a shell with no HVAC, lighting or metering systems. It is understood that there will be one tenant for the building.
Estimate annual energy use of the office outside U.S.
CI-v4 EAc4:Renewable energy productionposted by Ameet AA on
The project is in Ho Chi Minh city - tropical climate, so there is no demand for heating and the office will use only electricity.
Combining option 1 and 2
CS-v4 SSc2:Site development - protect or restore habitatposted by Emmanuel Pauwels on
Our project is a zero lot line. We would be able to install a green roof for 20% of the project site surface which is not enough since the treshold is 30%.
IN Credit 2: LEED Accredited Professional
CI-v4 INc2:LEED Accredited Professionalposted by Allen Cornett on
To achieve this credit must you have a LEED AP ID+C as a principal participant, or can you have a LEED AP BD+C as a principal participant on a commercial interiors project and still achieve this cr
design case water calculation
NC-v4 WEc2:Indoor water use reductionposted by Azaz Ansari on
why is the no information required to enter in design water calculation to accomodate visitors?
Please note we have visitor column in calculation sheet.