Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
1
Tue Nov 28, 2017, 4:28 pm
1
Fri Feb 23, 2018, 6:16 pm

Office Building with Data Center

NC-2009 EAc1:Optimize Energy Performance
posted by  Lise Dannesboe  on 

I have a possible case with a office building that also contains a large Data Center.

5
Delta Electronics
LEEDuser Basic Member
0 thumbs up
Mon Nov 27, 2017, 2:36 pm

green wall

CS-2009 IDc1:Innovation in Design
posted by  Daniela Castro Salgado  on 

I'm sure I read somewhere that including green walls in the project can help us earn an Innovation in Design point if it complies with a certain percetange of the building's footprint area.

3
Sun Nov 26, 2017, 6:30 pm

Requirement of entryway system

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Yan-Chuan Chen  on 

I am currently working on a residential building. For LEED V2009, the requirement of the permanent entryway system should have 3m long in the primary direction of travel.

1
Thu Apr 26, 2018, 10:25 pm

Shell with no energy or metering systems

CS-2009 EAc5.2:Measurement and Verification—Tenant Submetering
posted by  Martin Meehan  on 

Hello

My project is to be a shell with no HVAC, lighting or metering systems. It is understood that there will be one tenant for the building.

1
Fri Nov 24, 2017, 5:54 pm

Estimate annual energy use of the office outside U.S.

CI-v4 EAc4:Renewable energy production
posted by  Ameet AA  on 

The project is in Ho Chi Minh city - tropical climate, so there is no demand for heating and the office will use only electricity.

1
Fri Nov 24, 2017, 5:57 pm

Combining option 1 and 2

CS-v4 SSc2:Site development - protect or restore habitat
posted by  Emmanuel Pauwels  on 

Our project is a zero lot line. We would be able to install a green roof for 20% of the project site surface which is not enough since the treshold is 30%.

0

IN Credit 2: LEED Accredited Professional

CI-v4 INc2:LEED Accredited Professional
posted by  Allen Cornett  on 

To achieve this credit must you have a LEED AP ID+C as a principal participant, or can you have a LEED AP BD+C as a principal participant on a commercial interiors project and still achieve this cr

3
Default Avatar
LEEDuser Basic Member
27 thumbs up
Thu Nov 23, 2017, 8:57 am

design case water calculation

NC-v4 WEc2:Indoor water use reduction
posted by  Azaz Ansari  on 

why is the no information  required to enter in design water calculation to accomodate visitors? 

Please note we have visitor column in calculation sheet.

1
Mon Dec 4, 2017, 5:16 pm