Forum quick links
Cooling Towers
CI-v4 EAp3:Fundamental refrigerant managementposted by Laura Charlier on
If cooling tower is being replaced as part of project, does that need to be included in calcs?
What's the size requirement for a Data Center Project with LEED v4 BC+D and O+M?
EBOM-v4 MPR3:Must comply with project size requirementsposted by Xiaoyu Cao on
Hi,
I see the minimum size requirements for BD+C and O+M is ,
"LEED BD+C and LEED O+M Rating Systems
Walkable Project Site
NC-v4 INc1:Innovationposted by Quentin Jackson on
Hi all,
I'm working on a stadium project in Australia and we're looking at the walkable project site innovation credit.
Metering individual end uses >10%
NC-v4 EAc3:Advanced energy meteringposted by Carmen Mielecke on
Hello good morming, I would like to discuss the following example: If the simulation result on building level is, that the end use of lighting is >10% and the end use of user eq
2-year contract from what time?
NC-2009 EAc6:Green powerposted by Maria Porter on
I can find no evidence that the 2-year period needs to start as soon as the building is finished, is that the case?
is there a compliance path for multiple baselines?
NC-2009 EAp2:Minimum Energy Performanceposted by Courtney Royal on
Can LEED v2009 projects (which has ASHRAE 90.1-2007 baseline) demonstrate compliance using ASHRAE 90.1-2013? Is there any adjusted point scale which can be applicable for such projects?
Streams
NC-v4 MRc5:Construction and demolition waste managementposted by Charalampos Giannikopoulos on
In PR prerequisite it is required that 5 materials have been identified for diversion.
Does this count for LEED Credits?
NC-v4 MRc5:Construction and demolition waste managementposted by James Goldfield on
I am on a site where we have the option to chip the fallen tree's and stumps and sell that material to a power plant.