furniture made from laminated boards with A class according to French legislation

NC-v4 EQc2:Low emitting materials
posted by  Agnieszka Rylska  on 

In our project we have plan to make individual furniture components from laminated boards on site.

2
Independent consultant on VOC issues
formerly with Eurofins Product Testing A/S
LEEDuser Basic Member
246 thumbs up
Wed Nov 1, 2017, 5:44 pm
2
Wed Nov 1, 2017, 2:33 pm

Science behind maintaining internal temperature and relative humidity

NC-v4 EQc4:Indoor air quality assessment
posted by  Dionisio Franca  on 

Hi.

LEED requires "maintaining an internal temperature of at least 60°F (15°C) and no higher than 80°F (27°C) and relative humidity no higher than 60%."

2
Wed Nov 1, 2017, 1:56 am

Credit Documentation Requirements

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Jenelle Shapiro  on 

Is there a minimum requirement for supporting documentation for this credit in regards to uploading onto LEED Online?

1
Wed Nov 1, 2017, 2:32 pm

Waste Management Plan Requirements

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Chris Brown  on 

Are the anticipated diversion rates that need to be included in the waste management plan the overall diversion rate (e.g., 80% diverted) or per waste stream (e.g., 20% steel, 12% drywall, etc.)?

1
Tue Oct 31, 2017, 8:04 pm

Refrigerants

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Peter Doo  on 

Can proper recycling and/or disposal of refrigerants be considered a waste stream for the purpose of LEED compliance?

1
Tue Oct 31, 2017, 8:08 pm

Porous materials fully enclosed building?

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Summer Minchew  on 

I have seen IAQ specifications that state "Do not load or install drywall, other porous materials and components, and items with high organic content into partially enclosed building." Is this a re

1
Wed Nov 1, 2017, 3:07 pm
2
Integrated Design & LEED Specialist
SERA Architects
LEEDuser Expert
1361 thumbs up
Tue Oct 31, 2017, 5:29 pm

No cooling tower - District cooling

NC-v4 WEc3:Cooling tower water use
posted by  Martina Salonen  on 

Hello! We have project which would be applicable for the 'no cooling tower' alternative compliance credit. However, the client is now considering connection to the district cooling system.

2
Sustainability Specialist
Gensler
LEEDuser Basic Member
66 thumbs up
Tue Oct 31, 2017, 8:56 am