furniture made from laminated boards with A class according to French legislation
NC-v4 EQc2:Low emitting materialsposted by Agnieszka Rylska on
In our project we have plan to make individual furniture components from laminated boards on site.
Science behind maintaining internal temperature and relative humidity
NC-v4 EQc4:Indoor air quality assessmentposted by Dionisio Franca on
Hi.
LEED requires "maintaining an internal temperature of at least 60°F (15°C) and no higher than 80°F (27°C) and relative humidity no higher than 60%."
Credit Documentation Requirements
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jenelle Shapiro on
Is there a minimum requirement for supporting documentation for this credit in regards to uploading onto LEED Online?
Waste Management Plan Requirements
NC-v4 MRp2:Construction and demolition waste management planningposted by Chris Brown on
Are the anticipated diversion rates that need to be included in the waste management plan the overall diversion rate (e.g., 80% diverted) or per waste stream (e.g., 20% steel, 12% drywall, etc.)?
Refrigerants
NC-v4 MRp2:Construction and demolition waste management planningposted by Peter Doo on
Can proper recycling and/or disposal of refrigerants be considered a waste stream for the purpose of LEED compliance?
Porous materials fully enclosed building?
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Summer Minchew on
I have seen IAQ specifications that state "Do not load or install drywall, other porous materials and components, and items with high organic content into partially enclosed building." Is this a re
City right of ways
NC-2009 MPR3:Must use a reasonable site boundaryposted by Ashley Hu on
Hello there,
Measurement by deduction: hot and cold domestic water
EBOM-2009 WEc1:Water Performance Measurementposted by Marie-Michelle Coulombe on
Hello LEEDusers,
No cooling tower - District cooling
NC-v4 WEc3:Cooling tower water useposted by Martina Salonen on
Hello! We have project which would be applicable for the 'no cooling tower' alternative compliance credit. However, the client is now considering connection to the district cooling system.