Forum quick links
Greenbuild 2017 - You Have Questions, We Have Answers
NC-v4 SSc4:Rainwater managementposted by Michael DeVuono on
What are you doing on Friday November 10, 2017 at 8:00 am???
Sample VOC Calculator
CI-v4 EQc2:Low emitting materialsposted by Bill Eklund on
Does anyone have a sample VOC Calculator with smaple products filled in?
Existing trees over lawn area.
EBOM-v4 SSc1:Site Development- protect or restore habitatposted by Alfredo Lopez Mariscal on
Hello,
Building with the skyway
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Elżbieta Pawlak on
The Project is composed of 2 separate buildings connected together with 2 floors of underground garage and 8 floors of skyway.
"Planned Method for gathering feedback on Occupant Satisfaction"?
CI-v4 IPc1:Integrative processposted by Kathleen Sandberg on
What criteria do we have to include in our survey? Is there a requirement for timing, frequency, etc?
EnergyPro DOE-2 Output Report: system and plant throttling range %
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Spastri on
Hi all,
Decreasing Baseline Capacities for Unmet Load hours
NC-2009 EAp2:Minimum Energy Performanceposted by F S on
Hi All,
My question is basically about how much can you decrease the baseline capacities without going to far - that might call Red flags.
Minimum efficiencies for VRF with heat pump system
NC-v4 EAp2:Minimum energy performanceposted by Instra Ingenieros on
Hi there, I have a question regarding VRF efficiencies. We have an office building that have VRF with heat pump systems that provide cooling and heating.
Language of submission
posted by MAUDE PINTAL on
Hi,
We are in Quebec (Canada), and we are wondering if we can submit the LEED ND in Frensh ?
Thank you
Innovation - Bird Collision Deterrence
NC-v4 INc1:Innovationposted by Geoffrey Katz on
For the Pilot Credit Bird Collision Deterrence one requirement is to "Develop a three-year post-construction monitoring plan to routinely monitor the effectiveness of the building and sit