Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
4
Sat Jun 22, 2024, 9:03 pm

Minimum Program Requirements - Must use a reasonable site boundary: site + building

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Theresa Lehman  on 

This is a complex, multi-part question. An airport project is being phased and has multiple contracts. The scope includes replacing the runways and concrete around the terminals.

1
Fri Jun 21, 2024, 3:29 pm

Pilot Credit INpc155

Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Control
posted by  Roxanne Button  on 

Has anyone attempted this Pilot Credit yet?  Our project is a college science building which was under construction during the COVID-19 shutdown, and already incoporates most of the requiremen

15
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Jun 21, 2024, 2:53 pm
3
Sustainability Consultant
WSP
LEEDuser Expert
0 thumbs up
Fri Jun 21, 2024, 2:42 pm

LEED PC 66 Community Contaminant Prevention

Pilot-Credits EApc66:Community contaminant prevention - airborne releases
posted by  Amanda Brathwaite  on 

There are some applications, such as LPG (liquid petroleum gas) or diesel-fueled systems in remote locations, where you need to utilize combustion devices (stationary engines, boilers, etc) that do

5
Fri Jun 21, 2024, 2:34 pm

Recycled Content Report (Post-Consumer & PreConsumer)

NC-v4.1 MRc3:Sourcing of Raw Materials
posted by  Mu'ath Ad  on 

Hi, in my current project I am dealing with a manufacturer who provided the Recycled Content with percentage report with mention whether is post-consumer or pre-consumer for some reasons.

2
Default Avatar
Architect & LEED Coordinator
LEEDuser Basic Member
0 thumbs up
Fri Jun 21, 2024, 2:34 pm

Core and Shell Office

Pilot-Credits SSpc129:Comprehensive Composting
posted by  Michelle Rosenberger  on 

Signage, receptacles and outreach education are very different with a core and shell building with no internal tenants or project management in place.

0

Low Mercury Lamps

NC-2009 IDc1:Innovation in Design
posted by  Michelle Rosenberger  on 

It has always been my understanding, underscored by the LEEDuser LEED EBOM reference above in the Birdseye narrative, that an NC project could achieve an ID credit by complying with an EBOM credit.

18
Wed Jun 19, 2024, 9:43 pm

Snow Melt

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  Elizabeth Felder  on 

We have an ice melt product that consists of CMA and Dolomite (and a proprietary blend), but the manufacturer will not release the chemical breakdown.

7
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Jun 19, 2024, 8:27 pm
12
Wed Jun 19, 2024, 1:02 pm