Forum quick links
LEED ND Plan on Indoor Water Use Reduction
ND-Plan-v4 GIBp3:Indoor water use reductionposted by Michael Wahjudi on
Hi all,
Minimum Program Requirements - Must use a reasonable site boundary: site + building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Theresa Lehman on
This is a complex, multi-part question. An airport project is being phased and has multiple contracts. The scope includes replacing the runways and concrete around the terminals.
Pilot Credit INpc155
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Roxanne Button on
Has anyone attempted this Pilot Credit yet? Our project is a college science building which was under construction during the COVID-19 shutdown, and already incoporates most of the requiremen
Can the Shower Rooms be included in the Tenant's Sale Lease Agreement?
CS-v4 LTc6:Bicycle facilitiesposted by Nadia Garcia on
Hello LEED community,
LEED PC 66 Community Contaminant Prevention
Pilot-Credits EApc66:Community contaminant prevention - airborne releasesposted by Amanda Brathwaite on
There are some applications, such as LPG (liquid petroleum gas) or diesel-fueled systems in remote locations, where you need to utilize combustion devices (stationary engines, boilers, etc) that do
Recycled Content Report (Post-Consumer & PreConsumer)
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Mu'ath Ad on
Hi, in my current project I am dealing with a manufacturer who provided the Recycled Content with percentage report with mention whether is post-consumer or pre-consumer for some reasons.
Core and Shell Office
Pilot-Credits SSpc129:Comprehensive Compostingposted by Michelle Rosenberger on
Signage, receptacles and outreach education are very different with a core and shell building with no internal tenants or project management in place.
Low Mercury Lamps
NC-2009 IDc1:Innovation in Designposted by Michelle Rosenberger on
It has always been my understanding, underscored by the LEEDuser LEED EBOM reference above in the Birdseye narrative, that an NC project could achieve an ID credit by complying with an EBOM credit.
Snow Melt
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Elizabeth Felder on
We have an ice melt product that consists of CMA and Dolomite (and a proprietary blend), but the manufacturer will not release the chemical breakdown.
Kitchen exhaust in Multifamily buildings
NC-v4 EQp1:Minimum indoor air quality performanceposted by Nicolas Martinez Ochoa on
Hi everyone,