Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Adhesive the applied to the pre-fabricated materials

CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Panupant Phapant  on 

Hi Please advise whether the adhesive applied to the pre-fabricated materials that is furnished offsite must meet the VOC requirement.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Tue Oct 24, 2017, 2:12 am

Uplight

NC-v4 SSc6:Light pollution reduction
posted by  Carlie Bullock-Jones  on 

We have fixtures that are located in a covered area (under a plaza) which exceed the allowable uplight rating.

3
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Oct 23, 2017, 8:56 pm

Environmental Product Declarations

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Debra Sypien  on 

Does anyone know what type of documentation will come from an EPD? Will they all need a certificate? What type of questions will we need to ask subcontractors/manufacturers

8
Default Avatar
LEEDuser Basic Member
1 thumbs up
Mon Oct 23, 2017, 6:09 pm
4
Mon Oct 23, 2017, 2:06 pm

How to model glycol used for freeze protection in hydronic systems, i.e., not ice storage?

NC-v4 EAp2:Minimum energy performance
posted by  Jamy Bacchus  on 

If a proposed chiller (or boiler) meets the Tables 6.8.1A-J in 2007 or 2010, when tested with water at AHRI conditions but is designed to be used with glycol for freeze protection, then its actual

1
Wed Oct 25, 2017, 8:08 pm
1
Mon Oct 23, 2017, 5:27 pm

EPD of Products/Materials

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Ann E  on 

We are in our process of gathering and submitting our papers for LEED requirements but we our having a trouble regarding the EPD since none of our suppliers have a certification on hand.

1
Thu Oct 26, 2017, 12:25 am

LEEDv4 CI Office space - VRF software to calculate fan energy

CI-v4 EAc3:Advanced energy metering
posted by  Jane Christen  on 

We have a LEEDv4 CI Commercial Office space where in addition to those already metered, lighting, plug, etc., the other end uses are heating, cooling, and fan energy.

0

Prefererd parking spaces in Valet Parking - Hotel project

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Arub Vijay  on 

I have a hotel building project with 145 parking (Valet parking) which is less than the authority requirements of 165.

3
Thu Oct 19, 2017, 8:55 pm