Extended Producer Responsibility - documentation
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Tristan Roberts on
Has anyone pursued this credit using Extended Producer Responsibility? Did you find that you had to meet any specific documentation requirements?
ISO 50001 ACP
EBOM-v4 EAp1:Energy efficient best management practicesposted by veronica oyarzun on
For LEED EBOM 2009 there are ACP´s available through the ISO 50.001. How does it works for v.4?
LEED V2009 NC - DES Option 1 in Energy Model
NC-2009 EAp2:Minimum Energy Performanceposted by SSN Energy Model on
Hi,
achievability with green roofs
NC-v4 SSc2:Site development - protect or restore habitatposted by Jens Apel on
This project is previously developed, though existing buildings have been demolished and basically the site is a sand area with some vegetation on it that developed after demolition.
Distance between bicycle storage and bicycle network
NC-v4 LTc6:Bicycle facilitiesposted by Lise Dannesboe on
Hi.
"Design or locate the project such that a functional entry or bicycle storage is within a 200-yard (180-meter) walking distance or bicycling distance from a bicycle network"
EPD
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Ann E on
Hi! Is EPD for finish products/materials only or also for raws? Can you give examples of products/materials with EPD's?
Vertical Gardens
NC-v4 SSc2:Site development - protect or restore habitatposted by Magda Aghababyan on
Hi all,
We have a project which is going to have vertical gardens with native and adapted plants on the building walls. Can we count these areas for the credit compliance?
Saguaro Ribs
NC-2009 MRc7:Certified Woodposted by Cindy Quinn on
I have a project that is using saguaro ribs as one of its building materials. Do these ribs count as wood, and therefore need to be included in the total wood cost for MRc7?
Modeling low flow fume hoods in a Lab
NC-2009 EAp2:Minimum Energy Performanceposted by Joyce Kelly on
Owner wanted all fume hoods operating with 100cfm 24:7.
MBCx and Advanced Energy Metering
NC-v4 EAc1:Enhanced commissioningposted by Matt Grace on
Is it agreed that a project can pursue MBCx without first achieving Advanced Energy Metering?
Cheers,
Matt