Forum quick links
Patient Rooms
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Eric Brossy de Dios on
IEQ 8.2 calls for "A minimum of 90% of the inpatient units" to be within 20' of a perimeter that provides an unobstructed 11 degree (or more) view of exterior glazing.
Glass Roof Above Stairwell
NC-v4 SSc5:Heat island reductionposted by Lucas Ozols-Mongeau on
We are currently designing a new construction project that will have a glass roof above a stairwell shaft.
Total project users as a daily average
NC-2009 PIf3:Occupant and Usage Dataposted by Dave Hubka on
Project Information form #3 version 06 requires the project team to list the 'total project users as a daily average'.
Does anyone know which credit this links to?
Drywall replaced on int. non-structural wall
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Marisa Britton on
If a non-structural wall is to have the studs remain but the drywall replaced, will that area still qualify for the MRc1.2 calculation?
opaque building envelope construction
NC-v4 EAp2:Minimum energy performanceposted by Ahmed El-Semary on
i need to know what is required to be filled exactly in roof construction and whatis meant by building ID ??
Flooring & "categories"
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did? All flooring adhesives, coatings, sealers, grout, etc.? In Table 5 of the refer
Flooring & "categories"
NC-v4 EQc2:Low emitting materialsposted by Erin Holdenried on
Does the flooring category for Option 1 Threshold path include the same materials as LEED v2009 did? All flooring adhesives, coatings, sealers, grout, etc.? In Table 5 of the refer
Anticipated Tenant Fit Out
CS-2009 PIf3:Occupant and Usage Dataposted by Paula Hernandez on
Background: In a C&S building we suggest a Tenant fit out to comply with credit IEQ_c8.2, where we show meeting rooms, corridors and an office space layout resulting in a grater quantity of peo
Museum additional interior lighting
NC-2009 EAp2:Minimum Energy Performanceposted by Luis Andrade on
Hello,