Post a question or comment
Filter by location
Forum
Topic
Replies
Recent
11
Thu May 30, 2024, 7:37 am

Modeling a backup District energy source

CS-2009 EAp2:Minimum Energy Performance
posted by  Florian Pingaud  on 

Dear All, I am requesting help on the energy modeling protocol for a building both connected to a stand-alone plant and a district energy system. I read a lot of posts on the forum before posting

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 29, 2024, 1:08 pm

Products applied offsite and non-Occupied spaces

NC-v4.1 EQc2:Low-Emitting Materials
posted by  elias eid  on 

Hi all;

I would ask if the products applied offsite such as(paint for steel structural sections, Aluminum profiles, Wooden doors,...)

1
Thu May 30, 2024, 2:25 am

IAQ REPORTS

EBOM-v4.1 EQp4:Indoor Environmental Quality Performance
posted by  Nagaraj Sankar  on 
Regarding the v4.1 EBOM project, I have the following questions: 1) In one of our projects, we have met the CO2 and TVOC requirements as stated in the LEED v4.1 EBOM reference guide.
0

IAQ test report

EBOM-v4.1 EQp4:Indoor Environmental Quality Performance
posted by  Nagaraj Sankar  on 
The followingIn one of our project we have met the CO2 and TVOC requirements as stated in the LEED v4. 1 EBOM reference guide.
0

Native plants = No Irrigation Required?

NC-v4 WEc1:Outdoor water use reduction
posted by  Yoyo Shek  on 

Hi All,

Noted in the Step-by-Step Guidance, Step 2. Option 1. saying that:

5
Sun May 26, 2024, 5:16 am

Calculations or descriptions

NC-2009 EAc5:Measurement and Verification
posted by  Barbara Aguirre Garcia  on 

For credit, is it necessary to make calculations within the plan, regarding the baseline calculation, the reporting period? Or is it just describing the elements to do the calculations?

1
Tue May 28, 2024, 4:38 pm

Legal Wood Pilot Credit and MR BPDO Sourcing of Raw Materials / Alternate Compliance Path

CI-v4.1 IN101:Innovation
posted by  John Masters  on 

Need some direction regarding the Legal Wood Pilot Credit & ACP - MR BPDO Sourcing Raw Materials

4
Fri May 24, 2024, 6:53 pm

LEED O&M Starter Kit and Pilot Credit Safety First: Cleaning and Disinfecting Your Space

NC-v4 INc1:Innovation
posted by  James Keohane  on 

Is it acceptable to for a LEED v4 BD+C: NC project to seek BOTH innovation point for LEED O&M Starter Kit and a Pilot Credit INPC 137- Safety First:  Cleaning and  Disinfecting Y

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri May 24, 2024, 4:48 pm
4
Fri May 24, 2024, 3:23 pm