Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Window Sill Height

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Joseph Greene  on 

We are working on a project with 42" high window sills. Does this eliminiate any chance of achieving this credit? Must the sills be at 30"?

1
Mon Feb 7, 2011, 10:18 pm

Multiple Drainage Patterns

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Joseph Blanco  on 

Can you tell me how to calculate for multiple draingage sites, i have Three on this particular project. The TC is based on the length and travel and the slope towards the discharge point .

1
Tue Feb 8, 2011, 7:37 pm

2 things mat and chemical mixing area

CI-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Sue Barnett  on 

I have a major building entrance in my LEED boundary as well as some exterior entrances to a courtyard- do I need the mats to the courtyard area too? Then we have restrooms but no janitor closet or

1
Tue Feb 8, 2011, 3:46 am

LEED EBOM WEc1: Water Performance Measurement denied in Core & S

CS-2009 IDc1:Innovation in Design
posted by  Adriana Hansen  on 

We are proposing to install equipment for measuring the consumption of irrigation water, toilets and cooling towers.

1
Fri Mar 11, 2011, 4:46 am

small green field in the midst of developed area?

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Eric JS   on 

Dear all, Our site is a small narrow flat field full of grass with no previous human activity on it. However it is located in a developed industrial environment.

1
Tue Feb 8, 2011, 1:43 am

Elevator cabs

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Linda Davisson  on 

Often the finishes in an elevator cab are inert materials/non-emitting such as metal panels for walls and plastic unit lighting for ceilings.

1
Tue Feb 8, 2011, 6:51 pm

How to calculate Process Energy for CS?

CS-2009 EAp2:Minimum Energy Performance
posted by  Tatjana Ernst  on 

Hi everyone, we have an Core & Shell-Office Building. We are wondering how we have to calculate the process energy.

1
Mon Feb 14, 2011, 1:30 pm

Lift Energy assessment in LEED

NC-2009 EAc1:Optimize Energy Performance
posted by  Edwin Wealend  on 

Hi Is lift energy included as a process load as part of the 25% minimum requirement for process loads? If so are there any references or guidance on how to estimate its energy consumption.

1
Wed Feb 9, 2011, 2:08 pm

Growth and Erosion

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Adriana Hansen  on 

We have an HVAC system configured with ceiling plenum return. Is this plenum required to meet item (§ 5.5.1) Resistance to Mold Growth and (§ 5.5.2) Resistance to Erosion of ASHRAE 62.1?

1
Wed Feb 23, 2011, 11:35 pm

Cal Green Code Maximum Flow Rate for Non-Residential Fittings

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Jeremy Cressman  on 

Just when you thought you figured out the new commercial LEED faucet baseline (.5gpm or .25gallons per cycle) ... The State of California adopts the CalGreen Building Code effective January 2011 r

0