Overlit spaces, IEQc8.1
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Sarah Corbitt on
Hi, I've got a 9,400 SF building which serves as the offices for the athletic faculty at a small public university.
Pilot Credits in LEED 2009 for Healthcare
NC-2009 IDc1:Innovation in Designposted by Amy Balderrama on
There is some confusion around earning Innovation Points in LEED for Healthcare with pilot credits.
Retrocommissioning - Systems Requirements
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by Nate Eppley on
I am working on a cultural center performance space in San Diego with very few HVAC system components.
A building within college campus with shared parking
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Eri Spaulding on
My project is located within a college campus. The building does not have its own parking within the LEED boundary. However, there is a campus parking lot adjacent to the builidng.
Innovation in Design: Design or Construction?
NC-2009 IDc1:Innovation in Designposted by Lew Bonadies on
We are considering three Innovation in Design credits for a supermarket in LEED 2009 for Retail: a Food Donation program to reduce solid waste; an in-store and online Education program; and a Green
Case 2 of SSc5.2
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Mike Phelps on
The language for this case specifies open vegetated space "adjacent" to the building. Does adjacent mean next to the building or can it be vegetated open space near to the building as well?
Blow out water closets in LEED for Retail
NC-2009 WEc3:Water Use Reductionposted by Anders Olson on
The LEED NC for Retail rating system indicates a baseline performance of 1.6 gallons per flush (gpf) for all water closets except blow out fixtures, which are assigned a baseline performance of 3.5
Survey
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Adriana Hansen on
In approach 2 inside the option 3 of this credit we had some uncertainties on how we could proceed with the survey and sampling process.
No Furniture in project scope
CI-2009 MRc4:Recycled Contentposted by Marie Mihalik on
Can this credit, or MRc5, be attempted without CSI Division 12 Materials Cost or Furniture items included? The Furniture was not in the Architect's or the Contractor's scope of work.
EAc1-Overshadowing(LEED v2.2)
NC-2009 EAc1:Optimize Energy Performanceposted by gwenedd murray on
ASHRAE's table G3.1, section 5(a), states the baseline model should not shade itself.