EBOM-2009 SSc4:Alternative Commuting Transportationposted by gwenedd murray on
I think I might know this answer but I need some advice to confirm my hunch....The project I am working on is a 5,000sf university owned educational center located 30 min from an urban area.
PV & SRECS
Schools-2009 EAc2:On-Site Renewable Energyposted by James Geers on
If a project installs a PV system but sells a SREC for that system can it still qualify for EA c2?
Average Retail Customers for a Bank & Uploading Cut sheets
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Geoffrey Tomlinson on
The project that I am currently working on is a bank that has bathrooms in the lobby for client use and employee bathrooms in the office space behind the lobby.
CHPS Enough to qualify?
Schools-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Linda Davisson on
If a product is listed on the CHPS Low Emitting Materials Table (LEM) does it demonstrate compliance with the CA Department of Health Standard?
new RPc1 database
NC-2009 RPc1:Regional Priorityposted by Tristan Roberts on
There is a new tool from USGBC to help you identify your project's Regional Priority Credits (RPCs).
geographic issues
Pilot-Credits PC9:Street Networkposted by Christina Lynch on
The project site I am dealing with has a varied topography (outside Pittsburgh, PA), and I believe the geographic limitations of the site and surroundings made it difficult to meet the required thr
IEQp1: Title 24-2008 in lieu of ASHRAE 62.1-2007?
NC-2009 IEQp1:Minimum IAQ Performanceposted by Leticia SooHoo on
Fellow #LEED professionals: has anyone meet the requirements of IEQp1 using CA Title 24-2008 ventilation requirements in lieu of ASHRAE 62.1-2007?
Providing supporting info for "common materials" (reverb calcs)
Schools-2009 IEQp3:Minimum Acoustical Performanceposted by Renee Shirey on
The LEED v3 Reference book provides a table of "common materials". The LEED Online template asks for supporting documentation for all the materials used as an acoustic material finish.
MERV Filter during and after Test run
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Yong Lee Low on
Regarding the MERV filter, I had advised the M&E the LEED Requirements and he has replied as "During the test run period (80days), the MERV 8 will be installed on the AHU, PAH & VRF Indoor
IAQ - Visual Documentation
CI-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Gregory Minott on
I am working on an existing government project with restrictions on photography within the building.