Forum quick links
Does the 10% exclusion rule apply to this credit?
EBOM-2009 EAp3:Fundamental Refrigerant Managementposted by Jessica Hawley on
Does the 10% exclusion rule apply to this credit?
Existing bus stop
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by lance mccardle on
We are doing a major renovation on a multifamily housing complex that was built in 1990 with bike racks and a bus stop that the owners put in when the building was first constructed.
EAp2 X Multiple Building
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Adriana Hansen on
Dears, We would like to solve out some questions about the LEED EB certification process. In this case we have a boundary area with 4 towers.
How to deal with insecticide?
CS-2009 IEQc3:Construction IAQ Management Plan—During Constructionposted by Gabriela Hernández Castillo on
Our project is located at an area where COMEJEN is usual due to a very humid climate. COMEJEN is a sort of termite who lives in concrete cracks.
NC EAc6 Green Power - what is considered total building power?
NC-2009 EAc6:Green powerposted by Michael Hobson on
To quantify the total building's energy use and determine the 35% threshold to accomodate this credit, do we also include site power such as lighting, security, etc.?
Moisture Protection
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Brad Buser on
I need some help understanding the moisture projection requirements of this credit.
Recyclables + Sensitive Paper Estimate?
EBOM-2009 MRc7:Solid Waste Management—Ongoing Consumablesposted by Paul C on
We recently hire a new waste hauler who uses scaled front loader trucks to collect our waste & recyclables.
Uploading Documentation
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Maya Karkour on
Hi all, When submitting documentation for this credit, through LEED Online, are we supposed to upload all the plans showing the thermal controls or can we just upload some of them (i.e.
EAp1
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Christopher Kung on
We did our in house Level 1 Walk Through in 2007 and we got the Energy Label.
Garbage disposals with on-site wastewater treatment?
Schools-2009 WEc4:Process water use reductionposted by Anya Fiechtl on
The intent for this credit is "To maximize water efficiency within buildings to reduce the burden on municipal water supply and wastewater systems." The principal at our school was not willing to