Forum quick links
Unnecessary Permanent Irrigation
Schools-2009 WEc1:Water Efficient Landscapingposted by Tim Hoeft on
Our landscape designer has assured us that the native plant design will not require irrigation once established.
Minumum sight line height in existing building
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Susan Di Giulio on
I think I know the answer to this, but it's not the answer I want, so I'll throw it out there: I am working on an extensive remodel of a University dorm.The bottom of the existing rough wall openin
M&V data reporting
NC-2009 EAc5:Measurement and Verificationposted by Joseph Greene on
Please verify the reporting period is 1 year and not 2. Your sample M&V plan talks about a two year M&V period. Are templates available for data reporting and is there a required format?
Option 2: Restrictions?
CI-2009 SSc1:Site Selectionposted by on
Our project has a campus designed for 5 buildings. One building and the entire site was built out and received LEED Certified in 2004.
Biomass Boiler
NC-2009 EAc2:On-Site Renewable Energyposted by sara frye on
Our project, a small non-profit farm house renovation, is using a wood fired biomass boiler.
Credit 3.2, Option 1, Path 2
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Douglas Blakeslee on
We are the GC for a new small (4,000 SF) Leed Certified fast food restaurant with 3,800 CFM of outside air when occupied. We plan to do our initial 3,500 CF/SF flushout over a weekend.
Phased IAQ Testing?
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Q + on
Is it acceptable to perform air quality testing in phases? The project in question is a 175K sf school designed in 7 zones.
IAQ Testing and Furnishings
Schools-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Q + on
The Credit Language contains this statement regarding air quality testing and furnishings: "Movable furnishings such as workstations and partitions should be in place for the testing, although it
Supervising the Commissioning of 20% of the energy systems
NC-2009 EAc3:Enhanced Commissioningposted by Maya Karkour on
Hello, We are working on a project in which all the energy systems will be installed, tested and balanced by the general contractor.
Emission Reporting using Energy Star
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Simon Sue on
When i click on the "select view" then to Performance :GHG emission, i can see the current total GHG emission value, but when i try to generate SEP (Statement of Energy Performance) report, the GH