Forum quick links
Reuse of building structure
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Adriana Hansen on
Hello, We are working with a major renovation in a stadium.
Buy American
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Aliesa Adelman on
Is anyone familiar with an EVcharging station that meets the Buy American requirements?
WE 4.1 TEMPLATE
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Adriana Hansen on
In our project the towers has the following water cooling consumption during the Performance Period: Potable: KGALI 52.16 (4% of total) Non Potable: KGALI 346.71 (96% of total) TOTAL: 398.87 In m
Multiple HVAC Zone Controls - Credit towards Individual Comfort?
CI-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Simon Sue on
In a current commerical office project, we are considering the following thermal controls: -Individual thermostats for each private office or meeting room -One open office space with +/- 10 workst
Previosly multi-storey car park
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Mathilda Jonsson on
My project is a office/hotell project.
On-Street Parking
Pilot-Credits PC14:Walkable Streetsposted by Carly Ruggieri on
Can projects use on-street parking that has time limitations (e.g. Parking is prohibited from 8am-6pm on Weekdays)?
Air Pollution
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Lu Anne Nielsen on
SSp1 was marked under pending for my current project.
Calculating the required REC's
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Robin Obaugh on
This is related to Re-certification. We purchased 24 months of RECs during our initial certification. We have not determined when our next performance period will end, now or in the 5th year.
Maps
Pilot-Credits PC14:Walkable Streetsposted by Jacki Craig on
The credit asks for multiple types of map to show different site requirements.
Separated Baselines for Residential and Non-residential Portions
NC-2009 EAp2:Minimum Energy Performanceposted by Wenguang Wang on
We have a hotel development project in China seeking for the LEED-NC v2009 certification. We are now facing a problem of setting the baseline case for the energy model.