Forum quick links
Fuel type for system-5 Packaged system with reheat
NC-v4.1 EAp2:Minimum Energy Performanceposted by John on
Hi Folks,
Used AutoCASE software to achieve this credit
Pilot-Credits INpc122:Informing Design by Major Credit Category Using Triple Bottom Line Analysisposted by Megan Leslie on
I am using AutoCASE software to pursue the Informing Design Using Triple Bottom Line Analysis Pilot Credit as well as this Pilot Credit. It is interesting to see the results of the report.&nb
Low emitting materials - insulation category.
NC-v4 EQc2:Low emitting materialsposted by Keith Robertson on
Table 5 in the Low-emitting materials credit reference guide identifies a category of "Ceilings, walls, thermal, and acoustic insulation. Does that mean:
How to calculate the open habitat area related to Tree canopy and monoculture planting
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by Xinrong Zhao on
Hi,
My project recently received the commets:
Recycling Building Products
CS-v4 MRc5:Construction and demolition waste managementposted by Ciaran McCabe on
PC44 - where is the "Pilot Credit Feedback Survey"?
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Leticia SooHoo on
Our project is pursuing LEED v4 EQ44 -
Link to Zip Code Tool
Pilot-Credits IPpc98:Assessment and Planning for Resilienceposted by Jill Kurtz on
The Hazard Assessment prerequisite calls for “review [of] site-specific references where available to identify hazard risk modifiers of a particular location (e.g.
Innovation and Pilot credit clarification on Cleaning Policy
Retail-CI-v4 INc1:Innovationposted by Toshif Ruikar on
Hi,
Option 1: General Contractor, (and? or?) Subcontractor and Trades
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Vanessa Hostick on
In reviewing the language for Option 1 item 2, it is not clear if this language applies to all trades under the construction contract.
Previous Buildings Demolition activities
NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Carla Joan Carrasquillo on
I'm working with a project that comprehends various buildings (~20), from which only 10 will be certified.