Forum quick links
Project Costs
CS-2009 MRc4:Recycled Contentposted by Sara Neff on
Hello, I have a question about construction costs to calculate the recycled content value of my LEED project.
lighting space by space
CI-2009 EAp2:Minimum Energy Performanceposted by Billy Ng on
under ASHRAE Table 9--6, there is a space type as bank/office - banking activtiy area. how to justify this? I have an i-bank office fitout project.
Two building entrances
NC-2009 SSc2:Development Density and Community Connectivityposted by Cherie Morgan on
I have a project with over 300,000 SF in an urban area that includes an attached parking garage.
Views for an Apartment Building
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Lauren Fakhoury on
I'm working on documenting this credit for an apartment building but have a question about documenting it. Most of the floors are identical in terms of rooms square footage and layout.
"Blight" designation
Pilot-Credits PC19:Whole Building Reuseposted by Kath Williams on
The building we are reusing for a project is considered as "contributing" to the historic neighborhood.
LEED-CS v2.0 Title-24 2005 equivalent to ASHRAE 90.1-2004?
CS-2009 EAc1:Optimize Energy Performanceposted by Lauren Sparandara on
For projects registered under LEED-CS v2.0, is Title-24 2005 deemed equivalent to ASHRAE Standard 90.1-2004 for showing compliance with the EAc1 requirements?
Envelope requirements of ASHRAE 91.1-2007
CI-2009 EAp2:Minimum Energy Performanceposted by Cristina Valenzuela on
My client is doing an interior renovation of a small office at the ground floor in an existing mixed-use building.
Define "Owner" on a CI Project
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Andrew Laing on
Is the "Owner" the building owner/manager, or the tenant on CI project, assuming it is a multi-tenant building where the tenant and owner are not the same...?
Process for corrective action
CS-2009 EAc5.2:Measurement and Verification—Tenant Submeteringposted by Maya Karkour on
Hello, One of the requirements of EA Credit 5.2 is to "provide a process for corrective action if the results of the M&V plan indicate that energy savings are not being achieved".
Gross ARI rated cooling capacity
NC-2009 EAc4:Enhanced Refrigerant Managementposted by Devani PERERA on
Hi, Where should I get the "gross ARI rated cooling capacity" for air to water heat pumps ? This is not covered by ARI 550/590 which usually applies to chillers.