Does anyone know if the
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Diego Prada on
Hi, Does anyone know if the car parking lifts can be used for preferred parking?? Thanks
Project Site Area vs. LEED Boundary Area
Schools-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Breana Detzler on
We are currently doing a project registered under LEED for Schools 2007 and have a LEED Project Boundary that does not include the existing bus maintenance facility or a portion of the existing pa
Missing LEED information for some items
CI-2009 MRc4:Recycled Contentposted by Sandra Eremic on
There are a few items in my project for which LEED information is not available - like desk lamps, desk pads, hangers, coasters, even some fabrics. Can I still submitt for the credits?
Water Closet Baseline
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Brandon Dark on
Hello, I am working on a large LEED CI project where the tenant is occupying the majority of an existing building.
C&S scope
CS-2009 IEQp1:Minimum IAQ Performanceposted by Rubén M. R. on
We are working on a C&S project but in the middle of the design phase we learned that a gym will lease three floors.
IEQp1 and 62MZCalc
NC-2009 IEQp1:Minimum IAQ Performanceposted by Taylor Ralph on
In a project's IEQp1 we want to use a non-default value for occupancy of a Conference Room (a Critical Zone).
Credit for temporary irrigation
CS-2009 WEc1:Water Efficient Landscapingposted by Steve Salzman on
Hello, I'm wondering what people's experiences have been regarding the removal of irrigation after one year - specifically, what is considered "temporary"?
Tenant Infill within a Parking Garage
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Jon Texter on
Our Project is a restaurant taking up less than 75% of a parking garage. We are going for SSc3.3 Case 1 Option 1. Our lease provides us with access to two parking spaces.
Building footprint
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Albert Tappe on
Our project is an office tower connected to a large 4 level car park with a public plaza on top and retail at the perimeter on ground level.
Faucet Aerators use
CS-2009 WEp1:Water Use Reductionposted by Alessio Zampaglione on
Can someone confirm me that the use of faucet aerators is an allowed way to achieve WEp1 WE c3 for Leed CS v3 ? It's impossible to find a faucet with a so low flow rate in italy.