Forum quick links
No Smoking Signage at Retail Entrances
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Jessica Hawley on
I have a building with several ground-floor retail spaces.
Table SSc7.1-2 not populating
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by sara frye on
I have posed this question to LEED help but they have still not gotten back to me and I am getting impatient.
Counting of on-site / off-site parking
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Erin Holdenried on
We have a non-residential new construction campus project where the local authority has recommended 1028 spaces (no minimum or maximum).
Hand Dryers- Are they Considered Durable Goods?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Geoffrey Tomlinson on
We are purchasing hand dryers to eliminate paper waste, but since there are no EnergyStar rated hand dryers, would this count against us for our durable goods purchasing the performance period?
Building Move and Reuse
Schools-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Eric Carbonnier on
Would this be the appropriate credit to pursue the move and reuse of a structure?
ID Credit for Renewable Energy
NC-2009 IDc1:Innovation in Designposted by Dave Wortman on
We are interested in pursuing an ID credit for our new building's onsite renewable energy, namely our PV system.
Thermal Comfort Controls for Part Time Occupants
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Vishnu Jhaveri on
1) On my current project, we have an office room which has three work stations, served by one thermostat, one diffuser and no operable window.
Athena Eco Calculator - Cement replacement
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Kelly Roberts on
Can we scale our square footage inputs linearally to account for cement replacement in excess of 20%?
Which cost of materials to use?
Schools-2009 MRc5:Regional Materialsposted by Maya Karkour on
Dear all, The retail price of a certain product is $15 (anyone can buy it from the supplier for $15).
Multiple Occupancy
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Robert Barrett on
I would assume that in a multiple occupancy CS building, the shower and changing room(s) would need to be in a location that is readily accessible to all, like common space.