Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Compliance if there are no fixtures on the design

CS-2009 WEc3:Water Use Reduction
posted by  Jose Salinas  on 

Hi, The Owner is constructing a tower with high end tenants on the his scope.

1
Thu Jul 28, 2011, 4:43 am

Cost of Renewable Energy

NC-2009 EAc1:Optimize Energy Performance
posted by  Gregg Achtenhagen  on 

I am going to be modeling a building that plans on buying landfill gas to burn in boilers which will contribute to EAc2.

1
Thu Sep 8, 2011, 5:25 pm

Preferred Parking special parking lots

CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Markus Henning  on 

In our new project we provide 65 parking lots. To achieve the credit requirements we must provide 4 parking lots for low emitting vehicles. We provide 3 special parking lots for SMART cars.

1
Mon Jun 6, 2011, 4:56 pm

Can a restaurant achieve this credit?

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Wendy Shindledecker  on 

I'm starting a new project on a bar and grill this is seeking LEED silver. I'm a little confused on how a restaurant would achieve this credit.

1
Tue Jul 26, 2011, 12:07 am

LEED NC & CS v3.0 Quarterly addenda

CS-2009 WEp1:Water Use Reduction
posted by  Adriana Hansen  on 

The latest version of LEED NC & CS v3.0 Addenda incorporates changes and improvements to LEED 2009 resources. However there are some considerations that were not clear.

1
Tue Jul 5, 2011, 10:57 pm

IEQc7.1

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Robert Shapero  on 

Tristan, Is it possible to show a sample calc for credit 7.1. I am not sure how to calculate this and would welcome any insights as to how about providing this calculation.

1
Mon Nov 21, 2011, 4:52 am

SSc1 Path 4 Heat Island Effect- Nonroof

CI-2009 SSc1:Site Selection
posted by  Michelle Bracewell-Musson  on 

To clarify: 1.) Can I use a combination of underground parking stalls AND light colored pavement (SRI - 35 typical new gray concrete) AND landscape (tree) shading to achieve this point?

1
Thu Feb 16, 2012, 10:30 pm

ASHRAE mandatory provisions for existing building

NC-2009 EAp2:Minimum Energy Performance
posted by  Wei Jiang  on 

Our project is a major renovation project. Do the ASHRAE mandatory provisions apply to existing systems/components that are not altered?

1
Tue May 31, 2011, 2:00 pm

Dual Flush Converters

EBOM-2009 WEc2:Additional Indoor Plumbing Fixture and Fitting Efficiency
posted by  Prudence Ferreira  on 

Would the USGBC accept a dual flush converter as compliant vs installing new toilets?

1
Tue Sep 13, 2011, 2:19 pm

Building occupied intermittently and use of Motion Sensors

NC-2009 EAp2:Minimum Energy Performance
posted by  Brooks Critchfield  on 

We have a 3,000 SF building which will be occupied intermittently by the client/owner.

1
Mon Sep 19, 2011, 4:08 pm