Forum quick links
Schedule of Values from GC - can we use the 45% default in EBOM?
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by candice groves on
In LEED NC, when given a price from a subcontractor, we're able to use a 45% default for the actual material cost in order to exclude labor from that price.
Pool SRI
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Luis Miguel Diazgranados on
Hi What about a pool? In this project we are working on, there will be a pool in a terrace on the roof. What would it be it's SRI? Or does it depends on the tiling used under water?
Classroom and Lecture Halls Building on a University Campus
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Lisa Chow on
Hello, My building is located on a university campus and contains just 2 classrooms and 3 lecture halls (~15.5 ksf).
Clarification of wording
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Gary Atkins on
In attempt to clarify the wording for IEQ4.1 and IEQ4.2 that states "...defined as inside the weatherproofing system and applied on-site..." does this mean that both conditions must be satisfied fo
Additions to Credit Language
Pilot-Credits PC2:PBT Source Reduction: Dioxins and Halogenated Organic Compoundsposted by David Weimann on
Hi Brendan, pilot credit 2 obviously correlates with Green Guide for Healthcare EP Credit 3.1-3.5 "Toxic Chemicals Reduction".
Climate zone outside the USA
NC-2009 EAp2:Minimum Energy Performanceposted by Xing Shi on
We just finished the design submittals of 2 projects in Jiangsu, China. Does ASHRAE set climate zone in China.
Showing a reduction?
EBOM-2009 SSc6:Stormwater Quantity Controlposted by American University on
I'm unclear as to how we show a reduction in stormwater runoff. I see how we calculate the current runoff by figuring the area type and using the formula given, but what does that get compared to?
Process loads different between proposed & baseline designs
NC-2009 EAc1:Optimize Energy Performanceposted by Santiago Rodriguez on
For a major renovation of a restaurant they have made a major substitution of old kitchen appliances to new, more efficient equipment.
When to use Table vs. Spec rated power
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by James Shook on
Can someone clarify when to use the Table 2 rated power number vs. specification rated power. My example: Have 90 new computer monitors going into the project.
HVAC Equipment Efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sobral on
Dear LEED Users, Does anybody know if the minimum HVAC equipment efficiencies listed in Tables 6.8.1 of Standard 90.1 apply to the generator (i.e chiller, boiler, heat pump) or to the whole HVAC