Building Slabs: not in Developer's scope of work

CS-2009 EAp2:Minimum Energy Performance
posted by  LEED Pro Consultant  on 

In a LEED CS 2009 building energy simulation: we are modeling the building envelope to test performance (only the building envelope).

1
Wed Sep 28, 2011, 2:12 am

Method Choosing

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Austin Evans  on 

This is an industrial manufacturing facility, and we have filed our data online with Energy Star as Other-Other.

1
Mon Aug 15, 2011, 3:12 pm

Participation in Online Forum

Pilot-Credits PC6:Integrative Project Planning & Design
posted by  Miranda Gardiner  on 

You state the participation in the online forum is required for credit submission....but what does this exactly mean (e.g., does this question warrant participation?) and how should a team document

1
Tue Sep 11, 2012, 5:19 pm

Multiple Projects pursuing Pilot Credits 5&6

Pilot-Credits PC5:Preliminary Integrative Project Planning & Design
posted by  Miranda Gardiner  on 

I have several projects planning to pursue PC 5&6 - how does this translate for online participation? Am I required to participate separately for each project?

1
Wed Jul 6, 2011, 5:13 pm

Bldg Footprint_Cooling Tower & Generator

CS-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  Nancy Goshow  on 

We have a cooling tower and emergency generator adjacent to our building that is on a concrete pad and surrounded by a screen enclosure. Should this area count as part of the building footprint?

1
Wed Jul 27, 2011, 11:00 pm

Instantaneous and/or totalized

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  James Gray  on 

For natural gas metering applications, is continuous logging of instantaneous flows a requirement? Most meters just put out totalized pulses, so I'm assuming that's fine... Any thoughts?

0

Designated smoking area in a loading dock

EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Jessica Jones  on 

Can you please comment on whether the following approach would be acceptable to achieve this prerequisite: A project building is attached to a loading dock on the property, and the designated smok

1
Tue Nov 1, 2011, 2:32 pm

Floated tile paving and Heat Island Effect

EBOM-2009 SSc7.2:Heat Island Reduction—Roof
posted by  Mauricio Ramirez  on 

I have a building that has in the most part of their roof, a floating tile paving, that creates an air-chamber between the slab of the roof and the tilies of the paving.

1
Fri Sep 2, 2011, 2:15 pm

Percentage of finished floor complying for the credit

Schools-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Dario Ibarguengoitia  on 

MY QUESTION IS.. WHAT IF I JUST HAVE 25 % OF THE FINISHED FLOOR AREA USING LOW EMITTING OR CERTIFIED PRODUCTS, AM I STILL EARNING THE CREDIT?

1
Sun Jul 24, 2011, 4:40 am

Calculator

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Austin Evans  on 

In the Case 2 Option 2 tab for the offline calculator the cells are locked up on the option III enter current year EUI score as far as I can tell.

1
Wed Oct 5, 2011, 3:41 pm